LAISHA
Open Laisha

National Professional Practice Exam (NPPE)

Canada · Canadian engineering regulators

54practice questions written to this syllabus
1subjects

What National Professional Practice Exam is

National Professional Practice Exam (NPPE) is a licensing and registration exam run by Canadian engineering regulators, for candidates in Canada.

Format

110 MCQs (100 scored), 2.5 hours, remote-proctored, English or French, five sittings a year.

Sections

How it has changed

Law and ethics, not agricultural content. Blueprint from 2017; a review was expected mid-2026.

Official source: nppexam.ca

8 practice questions, worked

Original questions written to this exam's published syllabus and pattern. Not past papers.

1. A design engineer finds that a dryer his firm has already sold to many farmers can overheat and start fires under a foreseeable operating condition. His manager tells him to stay silent until the next model. What should he do first?

  1. Stay silent as instructed, since the decision to recall belongs to management alone
  2. Post the defect on social media at once so that farmers learn of it without delay
  3. Resign immediately and take the design files with him as evidence of the defect
  4. Report the hazard in writing to management with the evidence and a proposed remedy
Answer and working

D. Report the hazard in writing to management with the evidence and a proposed remedy

The engineer's duty is to protect public safety. The first step is to raise the concern clearly in writing within the organisation, with evidence and a remedy. If management refuses to act on a real danger, the codes require him to notify the appropriate authority. Public posting before using proper channels, or removing confidential files, is not the right first step.

Professional Practice, Ethics & Laws · Codes of ethics for engineers

2. Which plant-variety criteria are tested in a DUS examination?

  1. Durability, usefulness and safety
  2. Distinctness, uniformity and stability
  3. Disease resistance, uniformity and seed vigour
  4. Distinctness, utility and sustainability
Answer and working

B. Distinctness, uniformity and stability

Under UPOV and similar systems, a protectable variety must be new and distinct, uniform and stable (DUS), and have an acceptable denomination. Yield or disease resistance may be valuable but are not the DUS criteria.

Professional Practice, Ethics & Laws · Intellectual property

3. What is the correct order of preference for dealing with a hazard on a machine?

  1. Eliminate by design, then guard, then warn and instruct, then personal protective equipment
  2. Warn and instruct, then guard, then eliminate by design, then personal protective equipment
  3. Personal protective equipment, then warn, then guard, then eliminate by design
  4. Guard, then personal protective equipment, then eliminate by design, then warn
Answer and working

A. Eliminate by design, then guard, then warn and instruct, then personal protective equipment

The hierarchy of risk reduction puts inherently safe design first, safeguarding second, information for use third and PPE last. Warnings cannot substitute for a feasible safe design or a guard.

Professional Practice, Ethics & Laws · Safety and liability

4. Which FIDIC standard form is intended for engineer-procure-construct (turnkey) projects in which the contractor takes most design and construction risk?

  1. The Red Book
  2. The Yellow Book
  3. The Silver Book
  4. The Green Book
Answer and working

C. The Silver Book

FIDIC's Silver Book is for EPC/turnkey projects. The Red Book is for construction designed by the employer, the Yellow Book for plant and design-build, and the Green Book is a short form for simple or low-value work.

Professional Practice, Ethics & Laws · Contracts and specifications

5. A firm designs a tractor with a distinctive bonnet shape that does not affect how the tractor works. Which right best protects the shape?

  1. A patent for the bonnet
  2. Registration as an industrial design
  3. Plant variety protection
  4. A trade secret agreement
Answer and working

B. Registration as an industrial design

Industrial design rights protect the appearance of a product, its shape, configuration, pattern or ornament. Patents protect functional inventions; plant variety protection applies to plants; a visible shape cannot be kept secret.

Professional Practice, Ethics & Laws · Intellectual property

6. Which of the following is NOT an essential element of a valid contract in common-law systems?

  1. A written document signed in front of a notary public
  2. An offer and its unconditional acceptance
  3. Consideration given by each party
  4. Parties with the capacity to contract
Answer and working

A. A written document signed in front of a notary public

Offer, acceptance, consideration, capacity, free consent, lawful object and certainty are essential. Most contracts need not be in writing or notarised, although some kinds, such as land transfers, must be in writing under particular statutes.

Professional Practice, Ethics & Laws · Contracts and specifications

7. Which four elements must normally be shown to establish negligence?

  1. Intent to harm, a written contract, payment and loss
  2. A defective product, a sale, a warning and an injury
  3. Ownership, possession, use and depreciation of the asset
  4. Duty of care, breach of that duty, causation and damage
Answer and working

D. Duty of care, breach of that duty, causation and damage

Negligence requires a duty of care, a breach by falling below the required standard, causation linking the breach to the harm, and damage that is not too remote. Intent is not required, and negligence can arise without any contract.

Professional Practice, Ethics & Laws · Safety and liability

8. An irrigation canal is to be excavated where the volume of rock is very uncertain. Which contract type places the risk of quantity variation mainly on the owner?

  1. A lump-sum contract for the whole defined scope of the work
  2. An item-rate contract paid on actual measured quantities
  3. A turnkey EPC contract with a guaranteed completion price
  4. A design-build contract with a fixed price for the canal
Answer and working

B. An item-rate contract paid on actual measured quantities

In an item-rate contract the contractor quotes rates and is paid for quantities actually measured, so the owner bears the risk of quantities. Lump-sum, EPC and fixed-price design-build contracts place quantity risk on the contractor and need a well-defined scope.

Professional Practice, Ethics & Laws · Contracts and specifications

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock all 54 questions — National Professional Practice Exam (NPPE)

US$10 a month · one price worldwide · cancel any time

  • Every practice question for this course, with explanations
  • Timed papers for the exams this course leads to
  • Ask Laisha to explain any topic — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.