ICAR AICE-JRF/SRF (PhD admission and fellowship) · India · National Testing Agency for ICAR
Original practice questions written to the published syllabus · not past papersICAR AICE-JRF/SRF (PhD admission and fellowship) is a PhD, fellowship and lectureship exam run by National Testing Agency for ICAR, for candidates in India. LAN-based CBT, 2 hours, 120 MCQs, 480 marks, +4 / -1. 2026 exam on 4 July 2026. 72 subjects at 122 cities.
Source: cdnbbsr.s3waas.gov.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Taking an agricultural project from idea to appraisal to delivery, and building an agri-enterprise: feasibility, NPV and IRR, PERT/CPM, business plans and incubation.
Our 89 ICAR AICE-JRF/SRF questions in this subject: 11 easy, 47 medium, 31 hard, across 16 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.
The nominal discount rate is 12% and expected inflation is 5%. What is the exact real discount rate?
C. 6.67%
Fisher relation: real = (1 + nominal)/(1 + inflation) − 1 = 1.12/1.05 − 1 = 6.67%. 7.00% is the simple-subtraction approximation; 17.60% multiplies the two factors instead of dividing; 5% is the inflation rate itself. Real cash flows must be discounted at the real rate.
Two mutually exclusive projects cost 1,000 currency units each. A returns 1,500 currency units in year 3 only (IRR 14.5%). B returns 950 currency units, 150 and 100 in years 1-3 (IRR 15.5%). The opportunity cost of capital is 10%. Which should be chosen and why?
D. A, because its NPV at 10% (about 127) exceeds B's (about 63)
For mutually exclusive projects rank by NPV at the opportunity cost of capital (or by the IRR of the incremental flows). NPV(A) = 1,500 × 0.7513 − 1,000 = 127; NPV(B) = 63. The NPV curves cross at about 13.8% (the Fisher rate); below that A is better. Ranking by IRR is the classic error because IRR ignores scale and timing differences.
Which probability distribution does PERT assume for the duration of an individual activity?
B. Beta distribution
The three-point estimate te = (a + 4m + b)/6 derives from the beta distribution, which is bounded and can be skewed. The normal distribution is applied to the total project duration through the central limit theorem, not to each activity.
Which statement correctly contrasts CPM and PERT?
B. CPM uses single, known activity times; PERT uses three time estimates to handle uncertainty
CPM, developed for plant construction and maintenance with DuPont, assumes deterministic times and adds time-cost trade-offs; PERT, developed for the US Navy's Polaris programme, treats durations as random. Both model precedence.
Which of these is NOT one of the six aspects of project preparation listed by Gittinger?
C. Political
Gittinger's six aspects are technical; institutional-organisational-managerial; social; commercial; financial; and economic. Political considerations matter in practice but are not one of his analytical aspects.
In a logical framework matrix, what are the four columns?
C. Narrative summary, objectively verifiable indicators, means of verification, assumptions
Goal, purpose, outputs and activities are the rows (the hierarchy of objectives). The columns describe each level, how its achievement will be measured, where the evidence comes from, and what external conditions must hold.
A potato cold store is sized to hold the full peak harvest of its catchment. What must its technical and financial projections show that a simple 'rated capacity' figure hides?
D. Year-wise and season-wise capacity use, since the store will be partly empty much of the year
Revenue depends on space actually rented over the storage season, not on rated capacity. Projections assuming full utilisation overstate income; the study should show the expected fill rate for each year and season, based on catchment supply and competing stores.
Gittinger warns about a common error in the technical coefficients of agricultural projects. What is it?
C. Assuming research-station yields and rapid adoption rather than realistic on-farm results
Many failed projects rested on yields that farmers never achieved and on adoption schedules that were too fast. Coefficients should come from on-farm evidence with a realistic build-up. Physical contingencies and with-and-without comparisons are good practice.
Which of the following is NOT one of Schumpeter's five types of 'new combinations'?
D. Reducing wages to lower production cost
The five are: a new good or quality; a new method of production; a new market; a new source of raw material or half-manufactured goods; and a new organisation of an industry (creating or breaking a monopoly). Cutting wages is not innovation.
In Clarence Danhof's classification of entrepreneurs, a farmer who adopts a new practice only when failing to do so would clearly cause a loss is called:
B. Fabian
Danhof, studying American agriculture, identified innovative (introduce new ideas), imitative or adoptive (copy successful innovations), Fabian (very cautious, change only when forced by threat of loss) and drone (refuse to change even at a loss).
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.