ICAR AICE-JRF/SRF Production & Operations Management: practice questions

ICAR AICE-JRF/SRF (PhD admission and fellowship) · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
130written to this exam in this subject
16syllabus units

About ICAR AICE-JRF/SRF

ICAR AICE-JRF/SRF (PhD admission and fellowship) is a PhD, fellowship and lectureship exam run by National Testing Agency for ICAR, for candidates in India. LAN-based CBT, 2 hours, 120 MCQs, 480 marks, +4 / -1. 2026 exam on 4 July 2026. 72 subjects at 122 cities.

Source: cdnbbsr.s3waas.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Production & Operations Management in ICAR AICE-JRF/SRF

The heaviest source of questions. Expect definitions and attributions (Skinner, Hayes and Wheelwright, Taylor, Gilbreths, Shewhart, Deming, Juran, Crosby, Ishikawa, Taguchi, Ohno, Shingo, Orlicky, Hammer and Champy, Miles, Nakajima); layout types and line balancing (cycle time, minimum stations, efficiency, balance delay); location methods (factor rating, centre of gravity, locational break-even, Weber's material index); level, chase and mixed aggregate plans; MPS, time fences and ATP; SPT, EDD, critical ratio and Johnson's rule; method study symbols and steps, normal and standard time; ABC, VED and FSN; MRP netting, MRP II and ERP; JIT, kanban number, seven wastes, 5S, SMED; cost of quality, control-chart limits, Cp and Cpk, OC curves, AQL and LTPD; HACCP principles, ISO 9001 and 22000, BIS and AGMARK; maintenance types, availability, OEE and TPM.

Designing and running production: location, layout, planning, inventory, quality and productivity, applied to processing plants and agribusiness operations.

Our 130 ICAR AICE-JRF/SRF questions in this subject: 33 easy, 72 medium, 25 hard, across 16 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.

Question 1 · medium

A juice bottling plant must fill 60,000 bottles a day. Each filling machine is rated at 1,500 bottles per hour, the plant runs 16 hours a day, and machines achieve 80% of rated output on average. How many machines are needed?

  1. 3 machines
  2. 4 machines
  3. 2 machines
  4. 5 machines
Answer and working

B. 4 machines

Output per machine per day = 1,500 x 16 x 0.8 = 19,200. Machines = 60,000/19,200 = 3.125, rounded up to 4; rounding down to 3 leaves demand unmet. Ignoring the 80% factor gives 2.5, which also tempts students to answer 3; using 24 hours instead of 16 gives 2.08, wrongly rounded to 2. 5 over-provides.

Question 2 · medium

A sugar mill's crushing line has four sequential stages with hourly capacities of 120 t (cane preparation), 100 t (milling), 90 t (clarification) and 110 t (evaporation). What is the line's capacity, and where should the next investment go?

  1. 120 t per hour; the first stage sets the pace
  2. 105 t per hour; the average of the four stages
  3. 90 t per hour; expand clarification, the bottleneck
  4. 100 t per hour; expand milling, the heaviest equipment
Answer and working

C. 90 t per hour; expand clarification, the bottleneck

In a sequential process the system capacity equals the slowest stage, here clarification at 90 t/h. Averaging stages (105) or taking the first stage (120) overstates capacity; adding capacity elsewhere adds nothing until the bottleneck is relieved, after which milling at 100 t/h becomes the new bottleneck.

Question 3 · medium

As a processing operation moves from job-shop towards continuous-flow production, which change is expected?

  1. Flexibility of product mix increases
  2. Unit variable cost falls while fixed cost and capital intensity rise
  3. Work-in-process inventory rises
  4. Workers need broader craft skills to make each order
Answer and working

B. Unit variable cost falls while fixed cost and capital intensity rise

Continuous processes spread high fixed cost over large volumes, so unit variable cost falls, but flexibility falls and work-in-process is lower. Craft skills matter most in job shops; continuous plants need monitoring skills.

Question 4 · medium

A dal mill compares two sites. Site A: fixed cost 3,000,000 currency units a year, variable cost 400 per tonne. Site B: fixed cost 5,000,000 currency units a year, variable cost 300 per tonne. At what annual volume do the two sites cost the same?

  1. 20,000 tonnes
  2. 5,000 tonnes
  3. 80,000 tonnes
  4. 2,857 tonnes
Answer and working

A. 20,000 tonnes

Set 3,000,000 + 400V = 5,000,000 + 300V, so V = (difference in fixed cost)/(difference in variable cost) = 2,000,000/100 = 20,000 tonnes. Adding the fixed costs (80,000) or the variable costs (2,857) instead of subtracting them gives the wrong crossover; 5,000 divides the fixed-cost gap by Site A's full variable cost of 400 instead of the 100 gap.

Question 5 · medium

A custom flour mill has five orders on one machine, with processing time and due date in days: P 6 and 10, Q 2 and 6, R 8 and 18, S 3 and 15, T 9 and 23. Using the shortest-processing-time rule, what is the mean flow time?

  1. 15.4 days
  2. 13.6 days
  3. 13.0 days
  4. 5.6 days
Answer and working

C. 13.0 days

SPT order Q, S, P, R, T gives completion times 2, 5, 11, 19, 28; mean = 65/5 = 13.0. 15.4 is FCFS and 13.6 is EDD; 28/5 = 5.6 is mean processing time, not flow time.

Question 6 · medium

A dairy cooperative is choosing an ERP system. Which feature is most specific to its needs rather than to general manufacturing?

  1. A general ledger
  2. A payroll module
  3. A sales-order entry screen that records customer orders, prices and delivery dates
  4. Procurement from many farmers with quality-based payment and lot traceability
Answer and working

D. Procurement from many farmers with quality-based payment and lot traceability

General ERP covers accounts, payroll and sales. Agribusinesses also need grower accounts with payment on fat and SNF or sugar content, batch traceability and shelf-life control, which standard packages may lack without adaptation.

Question 7 · easy

Heijunka in the Toyota Production System refers to:

  1. Stopping the line when a defect is found
  2. Mistake-proofing devices
  3. Levelling production volume and mix over time
  4. Card-based pull signals
Answer and working

C. Levelling production volume and mix over time

Heijunka is level, mixed-model scheduling. Stopping the line is jidoka; mistake-proofing is poka-yoke; card signals are kanban.

Question 8 · hard

Which list gives Womack and Jones's five lean principles in order?

  1. Plan, do, check, act, standardise
  2. Define, measure, analyse, improve, control
  3. Sort, set in order, shine, standardise, sustain
  4. Specify value, identify the value stream, flow, pull, perfection
Answer and working

D. Specify value, identify the value stream, flow, pull, perfection

Lean Thinking (1996) set out value, value stream, flow, pull and perfection. PDCA is the Shewhart-Deming cycle, DMAIC is Six Sigma, and 5S is workplace organisation.

Question 9 · medium

In a flour mill, lorries queue for two hours at the weighbridge before unloading. In lean terms this is primarily:

  1. Over-processing
  2. Defects
  3. Mura only, because it is irregular
  4. Waiting waste
Answer and working

D. Waiting waste

Idle time of people, vehicles or material is waiting waste. Over-processing adds work the customer does not value; defects are rework or scrap.

Question 10 · medium

For the same filler (subgroups of 5, average range 8 g, D3 = 0, D4 = 2.114), what are the R chart limits?

  1. UCL 12.616 g, LCL 3.384 g
  2. UCL 16.912 g, LCL -0.912 g
  3. UCL 24 g, LCL 0
  4. UCL 16.912 g, LCL 0
Answer and working

D. UCL 16.912 g, LCL 0

R chart: UCL = D4 x R-bar = 2.114 x 8 = 16.912; LCL = D3 x R-bar = 0. The A2 factor belongs to the X-bar chart (8 +/- 4.616 gives 12.616 and 3.384); a symmetric lower limit (8 - 8.912 = -0.912) is wrong because D3 = 0 for n = 5; 24 uses 3 x R-bar.

A study plan for Production & Operations Management in ICAR AICE-JRF/SRF

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (48% of the 130 questions): TQM, statistical process control and acceptance sampling (16, 12%); Maintenance management (10, 8%); Standards: ISO, HACCP, national standards bodies and grade marks (10, 8%); Business process re-engineering, value engineering and lean (9, 7%); Master production schedule (9, 7%); Plant layout (8, 6%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Productivity (8, 6%); Work study (8, 6%); Aggregate planning: level, chase and mixed (7, 5%); Facility location (7, 5%); Inventory management (7, 5%); JIT and Kanban (7, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Materials management, MRP, MRP II and ERP (7, 5%); Forecasting (6, 5%); Process types: job, batch and continuous (6, 5%); Process-product matrix (5, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Process-product matrix (2 hard of 5), Aggregate planning: level, chase and mixed (2 hard of 7), TQM, statistical process control and acceptance sampling (4 hard of 16).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Productivity (3 easy of 8); Work study (3 easy of 8).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AICE-JRF/SRF Production & Operations Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.