LAISHA
Open Laisha

ICAR AIEEA-PG Business Statistics & Quantitative Methods: practice questions

ICAR AIEEA-PG (Master's admission and PG scholarship) · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
85written to this exam in this subject
12syllabus units

About ICAR AIEEA-PG

ICAR AIEEA-PG (Master's admission and PG scholarship) is a postgraduate admission exam run by National Testing Agency for ICAR, for candidates in India. Computer-based test, 120 minutes, 120 MCQs, +4 / -1 / 0 for unattempted, English only. 2026 exam on 4 July 2026. Fills 30% of Master's seats at agricultural universities.

Source: cdnbbsr.s3waas.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Business Statistics & Quantitative Methods in ICAR AIEEA-PG

Elements of statistics and tests of significance: mean, median, mode, SD and CV computations; probability rules; binomial, Poisson and normal; SRS and stratified sampling; z, t, chi-square and F tests with stated critical values; correlation and regression coefficients; index number formulas and tests; time-series components and trend.

Quantitative ability and data interpretation: averages, percentages, growth rates, weighted means, probability and quick calculations from tables.

The statistics every later subject leans on: describing data, probability, sampling, testing and relating variables, plus the mathematics economists use.

Our 85 ICAR AIEEA-PG questions in this subject: 27 easy, 41 medium, 17 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AIEEA-PG and are not shown on any other exam's page.

Question 1 · easy

Landholdings in a district have first quartile 1.2 ha and third quartile 3.6 ha. What is the quartile deviation?

  1. 1.2 ha
  2. 2.4 ha
  3. 0.5 ha
  4. 3.6 ha
Answer and working

A. 1.2 ha

Quartile deviation = (Q3 - Q1)/2 = (3.6 - 1.2)/2 = 1.2 ha. 2.4 ha is the interquartile range, not half of it; 0.5 is the coefficient of QD, (Q3 - Q1)/(Q3 + Q1) = 2.4/4.8, a unit-free number.

Question 2 · easy

The weight of fertiliser bags filled by a machine has a population SD of 1.2 kg. A random sample of 36 bags is weighed. What is the standard error of the sample mean?

  1. 0.033 kg
  2. 1.2 kg
  3. 0.2 kg
  4. 0.04 kg
Answer and working

C. 0.2 kg

SE = sigma/sqrt(n) = 1.2/6 = 0.2 kg. 0.033 divides by n instead of sqrt(n); 0.04 is the variance of the mean (0.2 squared).

Question 3 · medium

A seed company claims its hybrid averages 50 q/ha. Thirty-six demonstration plots average 52 q/ha; the population SD is known to be 6 q/ha. At the 5 per cent level (two-tailed critical z = 1.96), what is the conclusion?

  1. z = 0.33; do not reject the claim
  2. z = 2.00; do not reject the claim
  3. z = 12.00; reject the claim
  4. z = 2.00; reject the claim that the mean is 50
Answer and working

D. z = 2.00; reject the claim that the mean is 50

SE = 6/sqrt(36) = 1; z = (52 - 50)/1 = 2.00 > 1.96, so reject H0: mu = 50. 0.33 divides by the SD instead of the SE; 12.00 multiplies by sqrt(n) the wrong way.

Question 4 · hard

Three fertiliser schedules are each tried on 4 plots. The treatment sum of squares is 60 and the error sum of squares is 90. What is the ANOVA F and the conclusion at 5 per cent (critical F with (2, 9) df = 4.26)?

  1. F = 0.67; schedules do not differ
  2. F = 3.00; schedules differ significantly
  3. F = 2.67; schedules do not differ significantly
  4. F = 3.00; schedules do not differ significantly
Answer and working

D. F = 3.00; schedules do not differ significantly

Treatment df = 3 - 1 = 2; error df = 12 - 3 = 9. MS treatment = 60/2 = 30; MS error = 90/9 = 10; F = 3.00 < 4.26. 0.67 is SS treatment/SS error without dividing by df; 2.67 uses error df 8 instead of 9 (30/(90/8)).

Question 5 · medium

If each rainfall value is converted from mm to cm and each yield value from q/ha to t/ha, and 10 is then added to every yield value, what happens to the correlation between rainfall and yield?

  1. It is divided by 100
  2. It rises by 10
  3. It is divided by 10
  4. Unchanged
Answer and working

D. Unchanged

r is independent of change of origin and of scale (for positive scale factors). Only a negative scale factor on one variable flips its sign.

Question 6 · medium

A regression of yield (q/ha) on rainfall (mm) fitted over rainfall of 600 to 1,000 mm is Yield = 2.2 + 0.026 Rainfall. A field that received 850 mm yielded 25.0 q/ha. What is its residual?

  1. +0.7 q/ha
  2. -0.7 q/ha
  3. 24.3 q/ha
  4. +2.9 q/ha
Answer and working

A. +0.7 q/ha

Predicted = 2.2 + 0.026 x 850 = 24.3; residual = actual - predicted = 25.0 - 24.3 = +0.7. Predicted minus actual has the wrong sign; 24.3 is the prediction itself. +2.9 drops the intercept from the prediction (25.0 - 22.1).

Question 7 · easy

Which index number formula satisfies both the time reversal test and the factor reversal test?

  1. Laspeyres' base-weighted index
  2. Paasche's current-weighted index
  3. Simple aggregative index
  4. Fisher's ideal index
Answer and working

D. Fisher's ideal index

Fisher's index satisfies time and factor reversal (but not the circular test). Laspeyres and Paasche satisfy neither reversal test.

Question 8 · medium

When consumers shift purchases toward goods whose prices have risen less, a Laspeyres consumer price index tends to:

  1. Overstate the rise in the cost of living
  2. Understate the rise in the cost of living
  3. Measure it exactly
  4. Fall below the Paasche index always by a fixed amount
Answer and working

A. Overstate the rise in the cost of living

Laspeyres keeps base-period quantities, so it gives too much weight to goods that became relatively dearer and that people bought less of: an upward (substitution) bias. Paasche, with current quantities, tends to the opposite.

Question 9 · medium

Quarterly seasonal indices of fertiliser sales are computed as 130, 90 and 110 for the first three quarters. Under the usual convention, what is the fourth-quarter index?

  1. 70
  2. 100
  3. -30
  4. 110
Answer and working

A. 70

Quarterly indices sum to 400 (average 100). 400 - (130 + 90 + 110) = 70. 100 would be the average, not the missing value. -30 is the deviation from 100 (100 - 130), not the index itself.

Question 10 · easy

The trend value of a processor's sales for next quarter is 900 tonnes and that quarter's seasonal index is 85. Using the multiplicative model, what is the forecast?

  1. 1,059 tonnes
  2. 815 tonnes
  3. 985 tonnes
  4. 765 tonnes
Answer and working

D. 765 tonnes

Forecast = trend x seasonal index/100 = 900 x 0.85 = 765. 1,059 divides by 0.85 (that deseasonalises, it does not forecast); 815 subtracts 85 as if the model were additive. 985 adds 85 instead.

A study plan for Business Statistics & Quantitative Methods in ICAR AIEEA-PG

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (42% of the 85 questions): Tests of significance (12, 14%); Probability distributions (8, 9%); Regression (8, 9%); Sampling techniques (8, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Time series (8, 9%); Correlation (7, 8%); Index numbers (7, 8%); Mathematics for economics: differentiation and optimisation (6, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Measures of central tendency (6, 7%); Measures of dispersion (6, 7%); Mathematics for economics: linear algebra and integration (5, 6%); Probability (4, 5%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Tests of significance (6 hard of 12), Mathematics for economics: linear algebra and integration (2 hard of 5), Regression (3 hard of 8).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Probability (2 easy of 4); Mathematics for economics: linear algebra and integration (2 easy of 5).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AIEEA-PG Business Statistics & Quantitative Methods

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.