IIT JAM - Mathematical Statistics (MS) · India · IITs (JAM 2026 organised by IIT Bombay)
Original practice questions written to the published syllabus · not past papersIIT JAM - Mathematical Statistics (MS) is a postgraduate admission exam run by IITs (JAM 2026 organised by IIT Bombay), for candidates in India. Computer-based, 3 hours, 60 questions, 100 marks, English. Section A 30 MCQs (10 x 1 mark, 20 x 2 marks); Section B 10 MSQs (2 marks, no negative or partial marking); Section C 20 NAT (10 x 1, 10 x 2, no negative). MCQ wrong answers lose 1/3 or 2/3 mark.
Source: jam2026.iitb.ac.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Dose and response, time to event and disease in populations: direct and indirect assays, probit and logit analysis of LD50 and LC50, parallel-line and slope-ratio assays, Kaplan-Meier and Cox models, and the statistical side of plant and animal epidemiology. Introductory veterinary epidemiology lives in the Veterinary track; this is the statistics behind it.
Our 62 IIT JAM questions in this subject: 11 easy, 41 medium, 10 hard, across 11 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to IIT JAM and are not shown on any other exam's page.
In a slope-ratio assay, how is relative potency estimated?
A. As the ratio β_T/βₛ of the two slopes
Responses are linear in dose with a common intercept, and dose z of T acts like ρz of S, so β_T = ρβₛ.
Ten insects: deaths on days 2, 3 and 3, one censored on day 4, one death on day 5. What is the Kaplan-Meier estimate after day 5?
C. 0.583
After day 3, Ŝ = 0.7 with 7 at risk; the censored insect leaves at day 4, so 6 are at risk at day 5: Ŝ = 0.7 × 5/6 = 0.583. Counting the censored insect as a death gives 0.500; keeping it in the risk set at day 5 gives 0.600; dropping it altogether gives 5/9 = 0.556.
Why should numbers at risk be shown beneath Kaplan-Meier curves?
C. The right-hand tail rests on few subjects
Late steps can be driven by one or two subjects; numbers at risk tell readers how much to trust them.
When does the odds ratio approximate the risk ratio?
B. When the disease is rare
For rare outcomes, odds ≈ risks; with common outcomes the OR exaggerates the RR.
Which is a limitation of cross-sectional surveys of herds or fields?
B. No time order; long cases over-represented
Exposure and disease are measured together, so cause and effect cannot be ordered, and long-duration cases are over-represented.
Which design gives the strongest protection against confounding when evaluating a vaccine on farms?
B. A randomised field trial
Random allocation balances measured and unmeasured confounders in expectation; observational designs control only measured ones.
A test has sensitivity 0.90 and specificity 0.95. What is the positive likelihood ratio?
B. 18
LR+ = Se/(1 − Sp) = 0.90/0.05 = 18; LR− = 0.10/0.95 = 0.105.
What does the area under the ROC curve measure?
A. P(diseased reading > healthy reading)
AUC equals P(reading of a random diseased > random non-diseased), the Mann-Whitney statistic; 0.5 means no discrimination.
What is Youden's index J?
D. Se + Sp − 1
J ranges from 0 (useless) to 1 (perfect) and is maximised by one common choice of cut-off; Se/(1 − Sp) is LR+.
A Weibull model has shape α = 2 and rate λ = 0.1 per day, with hazard αλ(λt)^(α−1). What is the hazard at t = 5 days?
D. 0.10 per day
h(5) = 2 × 0.1 × (0.5)¹ = 0.10 per day; the hazard rises linearly in t when α = 2.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.