ICAR AICE-JRF/SRF Wildlife Management & Protected Areas: practice questions
ICAR AICE-JRF/SRF (PhD) — Subject 59 Forestry · India · National Testing Agency for ICAR
Original practice questions written to the published syllabus · not past papers
10worked here, free
38written to this exam in this subject
11syllabus units
About ICAR AICE-JRF/SRF
ICAR AICE-JRF/SRF (PhD) — Subject 59 Forestry is a PhD, fellowship and lectureship exam run by National Testing Agency for ICAR, for candidates in India. Computer-based, 2 hours, 120 MCQs (Part A 20 general; Part B 50 core group; Part C 50 subject), +4 / −1, maximum 480.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Wildlife Management & Protected Areas in ICAR AICE-JRF/SRF
Managing wildlife populations, habitats and protected areas, resolving human-wildlife conflict, enforcing wildlife law and running ecotourism. Animal health, capture drugs and wildlife disease are covered in the Veterinary track (wildlife-zoo-medicine).
Our 38 ICAR AICE-JRF/SRF questions in this subject: 1 easy, 18 medium, 19 hard, across 11 units.
10 practice questions, worked
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.
Question 1 · hard
Tiger reserves must have a Tiger Conservation Plan that covers:
Only the tourism zone
Both the core and the buffer
Only the core area
Only the villages outside the boundary
Answer and working
B. Both the core and the buffer
Required under the tiger chapter of the WPA.
Question 2 · hard
A limitation of management effectiveness scores is that they:
Rely partly on expert judgement
Cannot be repeated over time in any reserve
Measure only animal numbers
Are decided by tourists
Answer and working
A. Rely partly on expert judgement
Scores partly reflect expert judgement, so interpret with care.
Question 3 · hard
Poorly sited electric fences around one village can:
Eliminate conflict in all of the villages
Increase forest cover inside parks
Reduce elephant numbers directly
Shift conflict to neighbouring villages
Answer and working
D. Shift conflict to neighbouring villages
Displacement of conflict is common.
Question 4 · medium
Human-wildlife conflict is driven partly by social factors such as:
Rock type of the forest
Day length in winter
Trust in forest staff
Elevation of the village
Answer and working
C. Trust in forest staff
Tolerance depends on compensation, dependence and trust.
Question 5 · hard
Wildlife forensics laboratories mainly help enforcement by:
Setting tourism carrying capacity
Identifying species from seized parts
Estimating tiger density from camera traps
Designing wildlife corridors
Answer and working
B. Identifying species from seized parts
Morphology and DNA link evidence to species and individuals.
Question 6 · hard
A key requirement before any reintroduction under IUCN guidelines is:
Ensuring captive animals are tame
Securing tourism revenue first
Introducing a competing species
Removing the cause of decline
Answer and working
D. Removing the cause of decline
Otherwise the new population will decline again.
Question 7 · hard
PCC is 4,000 visits/day. Correction factors of 0.2 and 0.1 apply. Real carrying capacity is:
2,800 visits/day
3,600 visits/day
1,200 visits/day
2,880 visits/day
Answer and working
D. 2,880 visits/day
4,000 x 0.8 x 0.9 = 2,880. Subtracting 0.3 at once gives 2,800.
Question 8 · hard
Why do LAC frameworks focus on acceptable conditions rather than a single carrying capacity number?
Numbers give false precision
Numbers are always too low
Visitors cannot be counted
Impacts never change
Answer and working
A. Numbers give false precision
Monitoring indicators against standards is more robust.
Question 9 · hard
Eco-sensitive zones around protected areas are notified under the:
Forest (Conservation) Act, 1980
Biological Diversity Act, 2002
Prevention of Cruelty (Animals) Act, 1960
Environment (Protection) Act, 1986
Answer and working
D. Environment (Protection) Act, 1986
Notified by the environment ministry.
Question 10 · hard
Species recovery is generally most successful when:
Habitat is lost but breeding continues
Funding is short-term and uncertain
Local people bear all the costs
The main threat is removed
Answer and working
D. The main threat is removed
Plus habitat, sustained support and local benefit.
A study plan for Wildlife Management & Protected Areas in ICAR AICE-JRF/SRF
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
First, the heavy units (55% of the 38 questions): Ecotourism: principles, carrying capacity, community benefit (7, 18%); Captive breeding and reintroduction (5, 13%); Human-wildlife conflict: causes and mitigation (5, 13%); Protected area planning and management plans (4, 11%).
Read the manual chapters for these first and do every worked question you can find on them.
Then the middle band: Corridors and landscape connectivity (3, 8%); Principles of wildlife management (3, 8%); Protected area categories (IUCN) and networks (3, 8%); Endangered species recovery programmes (2, 5%).
Aim for one sitting per unit, then mixed questions across them.
Then the lighter units: Habitat management and manipulation (2, 5%); Wildlife crime, trade and enforcement (CITES) (2, 5%); Wildlife law: national acts and schedules (2, 5%).
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Leave time for the hard ones: Endangered species recovery programmes (2 hard of 2), Wildlife crime, trade and enforcement (CITES) (2 hard of 2), Ecotourism: principles, carrying capacity, community benefit (4 hard of 7).
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Bank the easy marks: Ecotourism: principles, carrying capacity, community benefit (1 easy of 7).
Do these early in revision so they are fast on the day.
Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.