GATE ES Environmental Impact Assessment & Strategic Environmental Assessment: practice questions

GATE — Environmental Science and Engineering (ES) · India · IITs and IISc on rotation (2027: IIT Madras)

Original practice questions written to the published syllabus · not past papers
10worked here, free
39written to this exam in this subject
12syllabus units

About GATE ES

GATE — Environmental Science and Engineering (ES) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 subject). MCQ, MSQ and NAT question types with negative marking on MCQ only, as in all GATE papers.

Source: gate2026.iitg.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Environmental Impact Assessment & Strategic Environmental Assessment in GATE ES

EIA process steps, screening and scoping, methods (checklists, Leopold matrix, networks, overlays, Battelle), impact prediction numericals (noise attenuation and decibel addition, mixing, dispersion), significance, EMP and Indian EIA Notification 2006 categories and stages.

The full EIA process as a practitioner runs it: screening, scoping, baseline studies, impact prediction, significance, mitigation hierarchy, environmental management plans, public consultation, review and follow-up, plus SEA and social impact assessment. The Agribusiness subject natural-resource-environmental-economics and the Agricultural Engineering waste subject each carry a one-unit introduction to EIA; this is the full subject.

Our 39 GATE ES questions in this subject: 16 easy, 18 medium, 5 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE ES and are not shown on any other exam's page.

Question 1 · medium

Which three groups of criteria are used for case-by-case screening under Annex III of the EU EIA Directive?

  1. Project characteristics, project location, and the type and characteristics of the impact
  2. Cost of the project, nationality of the developer, and number of jobs created in the region
  3. Size of the consultant firm, length of the report, and date of submission
  4. Political support, media coverage and number of objections received
Answer and working

A. Project characteristics, project location, and the type and characteristics of the impact

Annex III groups criteria into project characteristics (size, cumulation, resources, waste, risks), location (sensitivity, protected areas) and impact characteristics (magnitude, extent, probability, duration, reversibility, transboundary nature). The others are not screening criteria.

Question 2 · medium

What role does the 'no-project' (no action) alternative play in EIA?

  1. It is the alternative that the proponent must always select in the end, whatever the findings
  2. It is optional and may be ignored whenever the proponent prefers
  3. It describes the project after mitigation measures have been added
  4. It describes the future without the project and serves as the reference for comparison
Answer and working

D. It describes the future without the project and serves as the reference for comparison

The no-action alternative is the baseline against which other alternatives' impacts are measured. It need not be chosen, it is expected in good practice and required under NEPA, and the mitigated project is a separate alternative.

Question 3 · medium

For air quality baseline monitoring around a proposed industrial site, where should stations generally be located?

  1. Only inside the factory boundary at the location of the future stack and boiler house
  2. Only at the nearest city centre, whatever the wind direction
  3. Only upwind, because downwind areas will be affected later anyway
  4. Upwind and downwind of the site, including at sensitive receptors such as villages
Answer and working

D. Upwind and downwind of the site, including at sensitive receptors such as villages

Stations upwind give background; downwind stations and receptor locations show where impacts will fall, informed by the wind rose. Monitoring only inside the site, only in a distant city or only upwind misses receptors.

Question 4 · easy

In the Leopold matrix, what two values are entered in each relevant cell?

  1. Cost and benefit, each in currency units
  2. Probability and frequency, each as a percentage
  3. Area and duration, each in hectares and years
  4. Magnitude and importance, each on a scale of 1 to 10
Answer and working

D. Magnitude and importance, each on a scale of 1 to 10

Leopold et al. (1971) asked for magnitude (extent or degree, a factual estimate) and importance (significance, a judgement), each scored 1–10. The matrix does not record costs, probabilities or area-duration pairs.

Question 5 · medium

In the Battelle Environmental Evaluation System, how many parameter importance units (PIU) are distributed among the parameters?

  1. 1000
  2. 100
  3. 78
  4. 10
Answer and working

A. 1000

Battelle distributes 1000 PIU among 78 parameters in four categories (ecology, environmental pollution, aesthetics, human interest). 100 is a scale, 78 is the number of parameters.

Question 6 · easy

Overlay mapping as an EIA and planning method is most associated with whom?

  1. Luna Leopold, USGS (1971)
  2. Ian McHarg, Design with Nature (1969)
  3. Norbert Dee, Battelle (1973)
  4. Sherry Arnstein (1969)
Answer and working

B. Ian McHarg, Design with Nature (1969)

McHarg popularised overlaying maps of environmental factors to find suitable and sensitive areas. Leopold developed the matrix, Dee the Battelle system, and Arnstein the ladder of citizen participation.

Question 7 · hard

A point source produces 85 dB at 10 m. Assuming free-field spreading (L2 = L1 − 20 log10(r2/r1)), what is the level at 80 m?

  1. 66.9 dB
  2. 76.0 dB
  3. 10.6 dB
  4. 37.0 dB
Answer and working

A. 66.9 dB

L = 85 − 20 log10(80/10) = 85 − 20 × 0.903 = 66.9 dB (about 6 dB per doubling, three doublings). 76.0 uses the line-source 10 log rule; 10.6 divides decibels by distance ratio; 37 subtracts 6 dB for each multiple of distance instead of each doubling.

Question 8 · easy

What is an environmental management plan (EMP)?

  1. An action plan setting out mitigation, responsibilities, timing, budget and monitoring
  2. A national policy document listing protected areas and species in a country
  3. A map of the project area showing the location of baseline sampling stations and their codes
  4. A company's annual financial report with an environmental chapter
Answer and working

A. An action plan setting out mitigation, responsibilities, timing, budget and monitoring

The EMP turns EIA commitments into an implementable plan with responsibilities, schedules, costs, indicators and reporting. Policies, maps and annual reports are different documents.

Question 9 · hard

Baseline PM10 at a village is 72 µg/m³ against a standard of 100 µg/m³. Three proposed plants are each predicted to add 10 µg/m³ there. What is the cumulative concentration?

  1. 82 µg/m³, which meets the standard
  2. 30 µg/m³, which meets the standard
  3. 172 µg/m³, which exceeds the standard
  4. 102 µg/m³, which exceeds the standard
Answer and working

D. 102 µg/m³, which exceeds the standard

Cumulative = 72 + 3 × 10 = 102 µg/m³ > 100: each plant alone (82) appears acceptable but together they breach the standard. 30 ignores the baseline; 172 adds the standard.

Question 10 · medium

Which EU directive requires SEA of certain plans and programmes?

  1. Directive 2001/42/EC
  2. Directive 2011/92/EU
  3. Directive 2000/60/EC
  4. Directive 92/43/EEC
Answer and working

A. Directive 2001/42/EC

The SEA Directive is 2001/42/EC. 2011/92/EU is the EIA Directive; 2000/60/EC the Water Framework Directive; 92/43/EEC the Habitats Directive.

A study plan for Environmental Impact Assessment & Strategic Environmental Assessment in GATE ES

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (56% of the 39 questions): Impact identification: checklists, matrices, networks, overlays (9, 23%); Impact prediction and evaluation of significance (6, 15%); Screening and categorisation of projects (4, 10%); Baseline data collection (3, 8%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: History, purpose and principles of EIA (3, 8%); Legal frameworks: NEPA, EU EIA Directive, India EIA Notification and others (3, 8%); Scoping and terms of reference (3, 8%); Cumulative impact assessment (2, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Environmental management plans and monitoring (2, 5%); Strategic environmental assessment (2, 5%); Mitigation hierarchy: avoid, minimise, restore, offset (1, 3%); Public consultation and hearings (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Impact prediction and evaluation of significance (3 hard of 6), Cumulative impact assessment (1 hard of 2), Impact identification: checklists, matrices, networks, overlays (1 hard of 9).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Mitigation hierarchy: avoid, minimise, restore, offset (1 easy of 1); Baseline data collection (2 easy of 3).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE ES Environmental Impact Assessment & Strategic Environmental Assessment

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.