LAISHA
Open Laisha

GATE ES Soil Contamination, Toxicology & Remediation: practice questions

GATE — Environmental Science and Engineering (ES) · India · IITs and IISc on rotation (2027: IIT Madras)

Original practice questions written to the published syllabus · not past papers
10worked here, free
36written to this exam in this subject
12syllabus units

About GATE ES

GATE — Environmental Science and Engineering (ES) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 subject). MCQ, MSQ and NAT question types with negative marking on MCQ only, as in all GATE papers.

Source: gate2026.iitg.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Soil Contamination, Toxicology & Remediation in GATE ES

Heavy metals, pesticides, plastics and emerging contaminants in soils: fate, toxicity to organisms and people, risk assessment, and remediation including phytoremediation and microbial methods.

Our 36 GATE ES questions in this subject: 17 easy, 17 medium, 2 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE ES and are not shown on any other exam's page.

Question 1 · easy

Copper accumulates in vineyard and orchard soils mainly from:

  1. Nitrogen fertiliser applications each season
  2. Mulching with fresh straw
  3. Copper fungicides
  4. Drip irrigation with clean groundwater
Answer and working

C. Copper fungicides

Repeated Bordeaux mixture and other copper sprays build up copper.

Question 2 · easy

A cabbage contains 0.8 mg/kg Cd (dry weight) grown on soil with 4.0 mg/kg Cd. What is the soil-to-plant transfer factor?

  1. 3.2
  2. 5.0
  3. 0.20
  4. 20
Answer and working

C. 0.20

TF = C_plant/C_soil = 0.8/4.0 = 0.20. Inverting the ratio gives 5.0; multiplying gives 3.2.

Question 3 · medium

A pesticide degrades by first-order kinetics with a half-life of 30 days. What fraction remains after 90 days?

  1. 25%
  2. 5.0%
  3. 79%
  4. 12.5%
Answer and working

D. 12.5%

Three half-lives: 0.5^3 = 0.125 = 12.5%. Using e^(-t/t1/2) ignores ln 2.

Question 4 · easy

A fish contains 50 mg/kg of a chemical present in water at 0.01 mg/L. What is the bioconcentration factor?

  1. 49.99 L/kg
  2. 0.5 L/kg
  3. 5,000 L/kg
  4. 0.0002 L/kg
Answer and working

C. 5,000 L/kg

BCF = 50/0.01 = 5,000. Inverting the ratio or subtracting gives meaningless values.

Question 5 · easy

The oral LD50 of a pesticide in rats is 50 mg/kg. Scaled directly to a 70 kg person, what dose does this correspond to?

  1. 0.71 mg
  2. 3.5 mg
  3. 50 mg
  4. 3,500 mg
Answer and working

D. 3,500 mg

50 x 70 = 3,500 mg; interspecies extrapolation is uncertain.

Question 6 · easy

Which organism is the standard test species in OECD earthworm toxicity tests?

  1. Daphnia magna
  2. Danio rerio
  3. Eisenia fetida
  4. Arabidopsis thaliana
Answer and working

C. Eisenia fetida

Daphnia is aquatic, Danio a fish, Arabidopsis a plant. Eisenia fetida is the standard OECD earthworm species.

Question 7 · medium

With CDI = 0.00064 mg/kg/day and RfD = 0.0035 mg/kg/day, what is the hazard quotient, and is there concern?

  1. 0.18, below 1, low concern
  2. 5.5, above 1, concern
  3. 0.18, above 1, concern
  4. 2.24e-06, below 1, low concern
Answer and working

A. 0.18, below 1, low concern

HQ = 0.00064/0.0035 = 0.18 < 1. The reciprocal ratio or a product would misstate the hazard.

Question 8 · easy

Which is the first step of the NRC (1983) risk assessment paradigm?

  1. Exposure assessment
  2. Hazard identification
  3. Dose-response assessment
  4. Risk characterisation
Answer and working

B. Hazard identification

Followed by dose-response, exposure and risk characterisation.

Question 9 · medium

Which contaminant group is most amenable to bioremediation?

  1. Asbestos fibres
  2. Highly chlorinated PCBs
  3. Petroleum hydrocarbons
  4. Lead and cadmium
Answer and working

C. Petroleum hydrocarbons

Metals cannot be degraded; highly chlorinated compounds resist biodegradation.

Question 10 · medium

A contaminant has Kd = 2.0 L/kg in soil with bulk density 1.6 kg/L and water content 0.3. What is the retardation factor?

  1. 10.7
  2. 1.96
  3. 11.7
  4. 1.38
Answer and working

C. 11.7

R = 1 + (rho_b/theta) Kd = 1 + (1.6/0.3) x 2.0 = 11.7. Omitting the 1 or inverting rho_b/theta gives wrong values.

A study plan for Soil Contamination, Toxicology & Remediation in GATE ES

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (44% of the 36 questions): Bioremediation and phytoremediation (4, 11%); Human health risk assessment: hazard, exposure, dose, risk characterisation (4, 11%); Organic contaminants and xenobiotics (4, 11%); Principles of toxicology: dose-response, LD50, NOAEL (4, 11%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Contaminant leaching to groundwater (3, 8%); Ecotoxicology and ecological risk assessment (3, 8%); Permissible limits and soil screening values (3, 8%); Physical and chemical remediation (3, 8%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Bioaccumulation and biomagnification (2, 6%); Heavy metals: forms, mobility and plant uptake (2, 6%); Microplastics and emerging contaminants in agricultural soils (2, 6%); Sources of soil contamination: industrial, agricultural, urban (2, 6%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Bioremediation and phytoremediation (1 hard of 4), Human health risk assessment: hazard, exposure, dose, risk characterisation (1 hard of 4).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Heavy metals: forms, mobility and plant uptake (2 easy of 2); Sources of soil contamination: industrial, agricultural, urban (2 easy of 2).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE ES Soil Contamination, Toxicology & Remediation

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.