LAISHA
Open Laisha

Nepal Engineering Council Registration Exam — Agricultural Engineering

Nepal · Nepal Engineering Council · secondary source

683practice questions written to this syllabus
27subjects

What Nepal Engineering Council Registration Exam is

Nepal Engineering Council Registration Exam — Agricultural Engineering is a licensing and registration exam run by Nepal Engineering Council, for candidates in Nepal.

Format

Sections

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose.

Check the current format, eligibility, fees and dates on the official site: nec.gov.np.

How it has changed

The 10-chapter syllabus was read from a mirror (https://media.edusanjal.com/u/agricultural-engineering-registration-examination-syllabus_compressed.pdf) because the NEC guideline pages load only with JavaScript. Per-chapter weights are not stated.

How to prepare for Nepal Engineering Council Registration Exam

Where our 683 questions for it fall

Our reading of the syllabus, from the questions we have written to this exam; the exam body's own weighting, where published, is under Format above.

  1. Heaviest (70% of the questions): Crop Production & Protection for Engineers (86); Building Materials, Theory of Structures & Construction (78); Soil Mechanics (75); Engineering Economics, Project & Business Management (62); Sprinkler & Micro-Irrigation Systems (55); Protected Cultivation & Greenhouse Engineering (39); Bio-energy Systems: Design & Applications (32); Farm Machinery & Equipment I — Tillage, Sowing, Planting, Fertiliser (27); Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) (26).

    Start here: read these subjects' manuals first and work their questions until the reasoning is automatic.

  2. Middle band: Engineering Mechanics (Statics & Dynamics) (25); Agricultural Structures & Environmental Control (22); Strength of Materials (19); Watershed Planning & Management (17); Farm Power Sources (16); Farm Machinery & Equipment II — Plant Protection, Harvesting, Threshing (15); Renewable Energy Sources (Solar, Wind) (14); Watershed Hydrology (13); Farm Machinery Management & Economics (11).

    One pass per subject, then mixed sets across them.

  3. Lighter: Agricultural Drainage Engineering (10); Mechanics of Tillage & Traction (Soil Dynamics) (9); Food & Dairy Engineering (9); Fluid Mechanics & Open Channel Hydraulics (6); Storage Engineering, Material Handling & Packaging (6); Soil Science for Engineers (5); Electrical Machines & Power Utilisation (3); Soil & Water Conservation Engineering (2); Water Resources Management, Floods & Canal Systems (1).

    Definitions, classifications and standard figures; quick to revise, easy marks to lose.

  4. Hardest share: Electrical Machines & Power Utilisation (2 hard of 3), Watershed Planning & Management (4 hard of 17), Crop Production & Protection for Engineers (19 hard of 86).

    Leave untimed time for these and read every explanation, including for the options you rejected.

Official source: nec.gov.np

8 practice questions, worked

Original questions written to this exam's published syllabus and pattern. Not past papers.

1. What is the purpose of the earnest money deposit (bid security) submitted with a tender?

  1. To cover defects that appear during the defects liability period after completion
  2. To pay the contractor in advance for mobilising equipment to the site after award
  3. To pay liquidated damages if the completed work is handed over after the due date
  4. To guarantee that the bidder will not withdraw its bid and will sign the contract if it is accepted
Answer and working

D. To guarantee that the bidder will not withdraw its bid and will sign the contract if it is accepted

Bid security protects the owner during tendering; it is returned to unsuccessful bidders. After award, a performance security and retention money cover completion and defects; liquidated damages are deducted from payments. Amounts are set by local procurement rules.

Building Materials, Theory of Structures & Construction · Specifications and contracts

2. In English bond brickwork, how are headers and stretchers arranged?

  1. Every course is laid with stretchers only, offset by half a brick
  2. Each course has headers and stretchers alternating along its length
  3. Every course is laid with headers only, offset by a quarter brick
  4. Alternate courses are entirely headers and entirely stretchers
Answer and working

D. Alternate courses are entirely headers and entirely stretchers

English bond has a full course of headers, then a full course of stretchers, and is regarded as the strongest bond for walls one brick thick or more. Headers and stretchers alternating within each course is Flemish bond; all-stretcher is stretcher bond (half-brick walls); all-header is header bond (curved walls).

Building Materials, Theory of Structures & Construction · Bricks, stone and cement

3. What is the main purpose of a north-light (saw-tooth) roof truss in a workshop or packhouse?

  1. To increase natural ventilation by forming a ridge vent over the span
  2. To carry crane loads without any internal columns over long spans
  3. To admit even daylight through glazing that faces away from direct sun
  4. To shed heavy snow from both slopes equally in cold climates
Answer and working

C. To admit even daylight through glazing that faces away from direct sun

The steep glazed face is turned towards the pole (north in the northern hemisphere) to admit diffuse daylight without glare or solar heat gain. It is not primarily a snow, crane or ventilation device.

Building Materials, Theory of Structures & Construction · Trusses

4. In the economic (as opposed to financial) analysis of an irrigation project, how is a government subsidy on pump sets treated?

  1. It is added to the project's benefits, because it raises the farmers' net income
  2. It is deducted from the costs and kept, because it is cash the project receives
  3. It is excluded as a transfer, and pump sets are valued at their economic cost
  4. It is counted twice, once as a cost to government and once as a farmer benefit
Answer and working

C. It is excluded as a transfer, and pump sets are valued at their economic cost

Taxes, subsidies and loan transactions move purchasing power between groups without using real resources, so economic analysis removes them and values inputs at their economic or shadow prices. The financial analysis, from the farmer's viewpoint, does include the subsidy.

Engineering Economics, Project & Business Management · Project appraisal and detailed project reports

5. 1,000 kg of shelled maize at 22 % moisture (wet basis) is dried to 14 % (wet basis). How much water is removed?

  1. 140.0 kg
  2. 80.0 kg
  3. 93.0 kg
  4. 102.6 kg
Answer and working

C. 93.0 kg

Dry matter = 1,000 × 0.78 = 780 kg. Final mass = 780 ÷ 0.86 = 907.0 kg. Water removed = 1,000 − 907.0 = 93.0 kg. 80 kg subtracts percentage points of the initial mass; 102.6 divides by the initial dry fraction instead of the final one; 140 kg is the final moisture taken as a mass.

Crop Production & Protection for Engineers · Harvest index and harvest moisture

6. An emitter discharges 2.0 L/h at 100 kPa and 2.2 L/h at 150 kPa. What is its discharge exponent x?

  1. 0.200
  2. 0.235
  3. 0.500
  4. 4.25
Answer and working

B. 0.235

x = ln(q1/q2)/ln(h1/h2) = ln(2.2/2.0)/ln(150/100) = 0.0953/0.4055 = 0.235. 0.200 is the ratio of percentage changes (10 %/50 %), a linear approximation that is poor for a 50 % change; 4.25 inverts the ratio. 0.500 simply assumes a fully turbulent emitter.

Sprinkler & Micro-Irrigation Systems · Emitter hydraulics: exponent and coefficient of variation

7. An electric pump set has annual fixed costs of 60,000 and running cost 15 per hour; a diesel set has fixed costs of 20,000 and running cost 55 per hour. Which statement is correct?

  1. The diesel set is cheaper for any use above 1,000 hours of pumping a year
  2. The electric set is cheaper for any use above 1,000 hours of pumping a year
  3. The electric set is cheaper only above 1,500 hours, where its fixed cost is recovered
  4. The two sets cost the same at every level of use because their totals are equal
Answer and working

B. The electric set is cheaper for any use above 1,000 hours of pumping a year

Equal annual cost: 60,000 + 15h = 20,000 + 55h, so h = 40,000/40 = 1,000 h. Above that, the electric set's lower running cost outweighs its higher fixed cost; below it, diesel is cheaper. Any first costs should be converted to annual amounts with the capital recovery factor before this comparison.

Engineering Economics, Project & Business Management · Break-even analysis

8. A short, axially loaded 350 × 350 mm column has four 20 mm Fe500 bars and M25 concrete. Using Pu = 0.4 fck Ac + 0.67 fy Asc (IS 456), what is its design capacity?

  1. 1823 kN
  2. 1759 kN
  3. 1633 kN
  4. 1646 kN
Answer and working

C. 1633 kN

Asc = 4 × π × 20²/4 = 1256.6 mm²; Ac = 122,500 − 1256.6 = 121243.4 mm². Pu = 0.4 × 25 × 121243 + 0.67 × 500 × 1256.6 = 1633 kN. Using the gross area for concrete gives 1646; using 0.87 fy gives 1759; 1823 uses the pure-axial coefficients without the code's allowance for minimum eccentricity.

Building Materials, Theory of Structures & Construction · Reinforced concrete columns

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock all 683 questions — Nepal Engineering Council Registration Exam — Agricultural Engineering

US$10 a month · one price worldwide · cancel any time

  • Every practice question for this course, with explanations
  • Timed papers for the exams this course leads to
  • Ask Laisha to explain any topic — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.