LAISHA
Open Laisha

ICAR AIEEA-PG Statistical Quality Control & Reliability: practice questions

ICAR AIEEA-PG - Group 07 Statistical Sciences (Master's admission and PG scholarship) · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
28written to this exam in this subject
9syllabus units

About ICAR AIEEA-PG

ICAR AIEEA-PG - Group 07 Statistical Sciences (Master's admission and PG scholarship) is a postgraduate admission exam run by National Testing Agency for ICAR, for candidates in India. Computer-based test, 120 minutes, single paper of 120 MCQs, +4 / -1, English. 2026 exam on 4 July 2026. Fills ICAR's all-India quota of Master's seats at agricultural universities.

Source: cdnbbsr.s3waas.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Statistical Quality Control & Reliability in ICAR AIEEA-PG

Monitoring and accepting quality: Shewhart charts for variables and attributes, CUSUM and EWMA charts, process capability, acceptance sampling plans with their OC, AOQ and ATI curves, and reliability models, applied to seed testing, food processing and input quality. The Agricultural Engineering track covers control charts briefly; this is the full subject.

Our 28 ICAR AIEEA-PG questions in this subject: 14 easy, 14 medium, 0 hard, across 9 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AIEEA-PG and are not shown on any other exam's page.

Question 1 · easy

A worn filling nozzle shifts bag weights upward. What kind of cause of variation is this?

  1. A common cause
  2. An assignable cause
  3. Measurement noise
  4. A chance cause
Answer and working

B. An assignable cause

It is an identifiable, removable disturbance; chance (common) causes are the many small inherent sources of variation.

Question 2 · easy

How do control limits differ from specification limits?

  1. They are always equal
  2. Specification limits are computed from the data
  3. Process behaviour versus customer needs
  4. Control limits are set by the customer
Answer and working

C. Process behaviour versus customer needs

Control limits come from the process's own variation; specification limits are what the customer or standard demands.

Question 3 · medium

Subgroups of 5 bags give x̿ = 50.12 kg and R̄ = 0.40 kg; A₂ = 0.577. What are the X̄ chart limits?

  1. 49.72 to 50.52 kg
  2. 48.92 to 51.32 kg
  3. 49.889 to 50.351 kg
  4. 50.017 to 50.223 kg
Answer and working

C. 49.889 to 50.351 kg

x̿ ± A₂R̄ = 50.12 ± 0.231 = 49.889 to 50.351. A₂ already includes 1/√n, so dividing again is wrong.

Question 4 · easy

Weed seeds per 1-kg sample average 4. What are the c chart limits?

  1. 0 to 16
  2. 1 to 7
  3. 0 to 10
  4. 2 to 6
Answer and working

C. 0 to 10

c̄ ± 3√c̄ = 4 ± 6, so LCL = 0 (truncated) and UCL = 10.

Question 5 · medium

A plan n = 50, c = 1 is applied to lots that are 5% non-conforming. Using the Poisson approximation, what is P_a?

  1. 0.713
  2. 0.082
  3. 0.287
  4. 0.500
Answer and working

C. 0.287

np = 2.5: P(d ≤ 1) = e^(−2.5)(1 + 2.5) = 0.287; the exact binomial gives 0.279.

Question 6 · medium

For n = 50, c = 1 and large lots, P_a = 0.736 at p = 0.02. What is the AOQ under rectifying inspection?

  1. 0.0053
  2. 0.0200
  3. 0.7360
  4. 0.0147
Answer and working

D. 0.0147

AOQ ≈ P_a p = 0.736 × 0.02 = 0.0147. 0.0053 uses the rejection probability.

Question 7 · easy

What does the AOQL represent?

  1. Worst outgoing average
  2. The lot size limit
  3. The acceptance number
  4. The best incoming quality
Answer and working

A. Worst outgoing average

AOQL is the maximum of AOQ(p) over incoming quality under rectifying inspection.

Question 8 · easy

What is plotted on an OC curve?

  1. Defects against time
  2. Sample size against lot quality
  3. Outgoing quality against lot size
  4. P_a against lot quality
Answer and working

D. P_a against lot quality

The OC curve shows P_a(p) for each incoming fraction non-conforming.

Question 9 · medium

Twenty nozzles run 500 hours; four fail at 120, 250, 310 and 430 hours. Assuming exponential lives, what is the MLE of MTTF?

  1. 455.5 hours
  2. 277.5 hours
  3. 2500.0 hours
  4. 2277.5 hours
Answer and working

D. 2277.5 hours

Total time on test = 1,110 + 16 × 500 = 9,110 h; θ̂ = 9,110/4 = 2,277.5 h. Using only failed items' times gives 277.5 h.

Question 10 · easy

An exponential component has failure rate 0.001 per hour. What is its reliability for 500 hours?

  1. 0.393
  2. 0.999
  3. 0.500
  4. 0.607
Answer and working

D. 0.607

R(t) = e^(−λt) = e^(−0.5) = 0.607; 0.393 is the failure probability.

A study plan for Statistical Quality Control & Reliability in ICAR AIEEA-PG

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (54% of the 28 questions): Acceptance sampling by attributes: single, double and sequential plans (5, 18%); Control charts for attributes: p, np, c and u charts (5, 18%); OC, AOQ, AOQL, ASN and ATI curves (5, 18%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Reliability: hazard rate, series and parallel systems, life testing (4, 14%); Chance and assignable causes of variation (3, 11%); Control charts for variables: X-bar, R and s charts (3, 11%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: CUSUM and EWMA charts (1, 4%); Process capability indices (1, 4%); Six Sigma and design for quality (introduction) (1, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Bank the easy marks: Chance and assignable causes of variation (3 easy of 3); Process capability indices (1 easy of 1).

    Do these early in revision so they are fast on the day.

  5. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AIEEA-PG Statistical Quality Control & Reliability

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.