LAISHA
Open Laisha

ICAR AICE-JRF/SRF Computing, Data & Digital Tools for Dairy: practice questions

ICAR AICE-JRF/SRF (PhD): Dairy Chemistry, Dairy Microbiology, Dairy Technology, Dairy Engineering · India · NTA for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
16written to this exam in this subject
10syllabus units

About ICAR AICE-JRF/SRF

ICAR AICE-JRF/SRF (PhD): Dairy Chemistry, Dairy Microbiology, Dairy Technology, Dairy Engineering is a PhD, fellowship and lectureship exam run by NTA for ICAR, for candidates in India.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Computing, Data & Digital Tools for Dairy in ICAR AICE-JRF/SRF

Spreadsheets, databases, programming basics and the digital systems a dairy plant now runs on: milk collection software, ERP, LIMS and traceability.

Our 16 ICAR AICE-JRF/SRF questions in this subject: 0 easy, 0 medium, 16 hard, across 10 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.

Question 1 · hard

Audits of operational spreadsheets have repeatedly found that:

  1. Errors occur only in sheets written by beginners and never in expert work
  2. Spreadsheet errors are always caught by the software's built-in checks
  3. Spreadsheets used for payments are legally exempt from data-integrity rules
  4. A large share contain errors, many of them material
Answer and working

D. A large share contain errors, many of them material

Field audits (summarised by Panko and others) show error rates high enough that most large sheets contain at least one error; testing and review are essential.

Question 2 · hard

Which data-quality dimension is violated when the same product has different codes in the production and sales systems?

  1. Timeliness
  2. Consistency
  3. Accuracy of a single measurement
  4. Completeness of a single record
Answer and working

B. Consistency

Consistency means the same fact is represented the same way across systems; inconsistency breaks traceability links.

Question 3 · hard

Why may 0.1 + 0.2 not compare exactly equal to 0.3 in many programming languages?

  1. The computer rounds every number to the nearest integer before adding
  2. Addition is carried out in base 16 internally
  3. Decimal numbers are stored as text strings
  4. Binary floating point cannot store most decimals exactly
Answer and working

D. Binary floating point cannot store most decimals exactly

IEEE binary floating point stores approximations of decimals; money calculations use rounding or decimal types.

Question 4 · hard

Which practice lets a team see who changed a calculation script, when and why, and restore an earlier version?

  1. Version control
  2. Data compression
  3. Screen sharing
  4. Spell checking
Answer and working

A. Version control

Version control systems keep the full history of changes with authors and messages.

Question 5 · hard

An analyser reads fat 0.1 percentage point too high. A centre collects 2,000 kg of milk a day, paid at 5.00 currency units per kg fat. How much is overpaid per day?

  1. 10 currency units
  2. 100 currency units
  3. 1 currency unit
  4. 1,000 currency units
Answer and working

A. 10 currency units

0.1% of 2,000 kg = 2 kg fat; 2 × 5.00 = 10 currency units per day, over 3,600 a year.

Question 6 · hard

Most failed ERP projects in food companies fail mainly because of:

  1. Defects in the database engine that corrupt all records at go-live
  2. The cost of computer hardware exceeding the software licence
  3. Organisational issues: processes, master data and training
  4. Regulations that forbid integrated software in food plants
Answer and working

C. Organisational issues: processes, master data and training

Studies of ERP implementations point to people, process and data problems rather than technology.

Question 7 · hard

Integration of the LIMS with procurement software allows:

  1. Analysers to calibrate themselves without any reference samples
  2. Farmers to change their own test results
  3. Quality results to feed payment automatically
  4. The laboratory to skip sample registration
Answer and working

C. Quality results to feed payment automatically

Results flow to payment without re-entry, under controlled interfaces.

Question 8 · hard

A mock recall traces a butter lot and accounts for only 95% of the quantity produced. The correct response is to:

  1. Investigate the gap as a failure
  2. Accept it, since 95% is close enough for a perishable product
  3. Repeat the test until it closes
  4. Change the produced quantity in the records
Answer and working

A. Investigate the gap as a failure

Mass balance must reconcile; an unexplained gap shows missing records or unrecorded flows.

Question 9 · hard

Calibrating a near-infrared analyser to predict fat in milk powder from hundreds of correlated wavelengths usually uses:

  1. Partial least squares regression
  2. A chi-square test
  3. Simple linear regression on one wavelength
  4. A Pareto analysis
Answer and working

A. Partial least squares regression

PLS handles many collinear predictors and is the standard chemometric method.

Question 10 · hard

Edge computing in a remote chilling centre is valuable mainly because it:

  1. It removes the need for any sensors at the centre
  2. It stores all data permanently on the cooler
  3. It increases the cooling capacity
  4. It works locally when the network fails
Answer and working

D. It works locally when the network fails

Local processing reduces data sent and allows immediate responses during connectivity loss.

A study plan for Computing, Data & Digital Tools for Dairy in ICAR AICE-JRF/SRF

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (56% of the 16 questions): Data analysis and visualisation (3, 19%); Automatic milk collection units and farmer payment systems (2, 13%); Cybersecurity basics for plant control systems (2, 13%); Introductory programming and scripting (2, 13%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Laboratory information management systems (2, 13%); Databases and data management (1, 6%); Enterprise resource planning in dairy companies (1, 6%); Sensors, IoT and cloud data in dairy (1, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Spreadsheets for plant and laboratory calculations (1, 6%); Traceability and recall software (1, 6%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Data analysis and visualisation (3 hard of 3), Automatic milk collection units and farmer payment systems (2 hard of 2), Cybersecurity basics for plant control systems (2 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AICE-JRF/SRF Computing, Data & Digital Tools for Dairy

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.