LAISHA
Open Laisha

Tamil Nadu PSC Soil & Water Conservation Engineering: practice questions

Tamil Nadu PSC — Agricultural Engineering (Code 164, degree standard) · India · Tamil Nadu Public Service Commission

Original practice questions written to the published syllabus · not past papers
10worked here, free
51written to this exam in this subject
13syllabus units

About Tamil Nadu PSC

Tamil Nadu PSC — Agricultural Engineering (Code 164, degree standard) is a government recruitment exam run by Tamil Nadu Public Service Commission, for candidates in India. Degree-standard subject paper (for posts such as Assistant Engineer (Agri)).

Source: tnpsc.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Soil & Water Conservation Engineering in Tamil Nadu PSC

Estimating erosion and designing the bunds, terraces, waterways, spillways, ponds and dams that control it.

Our 51 Tamil Nadu PSC questions in this subject: 25 easy, 22 medium, 4 hard, across 13 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to Tamil Nadu PSC and are not shown on any other exam's page.

Question 1 · easy

The three phases of every water erosion event, in order, are:

  1. transport, detachment and consolidation
  2. infiltration, runoff and deposition
  3. detachment, transport and deposition
  4. splash, sheet flow and gullying
Answer and working

C. detachment, transport and deposition

Soil must first be detached (by raindrop impact or flow shear), then transported by runoff, then deposited where the flow slows. Splash, sheet and gully are forms of erosion, not phases.

Question 2 · easy

Vetiver grass is widely used in soil conservation mainly as:

  1. a cover crop sown between rows and ploughed in as green manure before sowing
  2. a dense, deep-rooted contour hedge that slows runoff and traps sediment
  3. a shelterbelt tree species
  4. a lining for concrete chute spillways
Answer and working

B. a dense, deep-rooted contour hedge that slows runoff and traps sediment

Vetiver forms a stiff, dense hedge along the contour; sediment deposits behind it and natural terraces form over time. It is not a shelterbelt tree or a green manure crop.

Question 3 · easy

Using VI = 0.3(S/3 + 2), with S in percent, the vertical interval between contour bunds on a 6% slope is:

  1. 2.4 m
  2. 0.6 m
  3. 4.0 m
  4. 1.2 m
Answer and working

D. 1.2 m

VI = 0.3 × (6/3 + 2) = 0.3 × 4 = 1.2 m. Forgetting to divide S by 3 gives 2.4; forgetting the 0.3 gives 4.0. Dropping the S/3 term gives 0.3 × 2 = 0.6 m.

Question 4 · easy

Surplus arrangements such as waste weirs are provided in contour bunds to:

  1. provide an inlet for irrigation water
  2. let runoff in excess of the design storage pass safely without breaching the bund
  3. drain all of the runoff from the field immediately so that no water is stored behind the bund
  4. measure the runoff from each strip
Answer and working

B. let runoff in excess of the design storage pass safely without breaching the bund

A bund stores only the design runoff. Waste weirs at low points or ends pass the excess in a controlled way; without them water overtops at the weakest point and breaches the bund.

Question 5 · medium

In the field, contour bund alignments are best located using:

  1. a levelling instrument to peg points of equal elevation, then smoothing sharp bends
  2. a straight line joining the highest and lowest corners of the field, marked out with ranging rods
  3. the direction of the prevailing wind
  4. a compass bearing perpendicular to the field boundary
Answer and working

A. a levelling instrument to peg points of equal elevation, then smoothing sharp bends

A contour is a line of equal elevation, so it must be pegged with a level (dumpy level, total station or a simple water-tube or A-frame level). Sharp bends are eased into curves so implements can follow them.

Question 6 · medium

For level bench terraces with vertical risers and a vertical interval of 1.2 m, the earthwork (cut) per hectare is:

  1. 1,042 m³
  2. 6,000 m³
  3. 1,500 m³
  4. 3,000 m³
Answer and working

C. 1,500 m³

Length of terrace per ha = 10,000/W; cut per metre = W·VI/8; so cut per ha = 10,000 × VI/8 = 1,250 × VI = 1,500 m³, independent of W. 3,000 m³ double-counts fill; 6,000 m³ uses the whole triangle under the original slope (W·VI/2 per metre). 1,042 m³ divides 1,250 by VI instead of multiplying.

Question 7 · hard

On a 20% slope the soil is deep enough to allow at most 0.5 m of cut at the inner edge of a level bench (vertical risers, balanced cut and fill). The widest bench that can be built without cutting below this depth is:

  1. 5.0 m
  2. 0.2 m
  3. 1.0 m
  4. 2.5 m
Answer and working

A. 5.0 m

For a balanced level bench, the cut at the inner edge is VI/2. Cut ≤ 0.5 m gives VI ≤ 1.0 m. W = 100 VI/S = 100 × 1.0/20 = 5.0 m. Treating 0.5 m as the VI gives 2.5 m, an unnecessarily narrow bench. 0.2 m multiplies VI by S/100 instead of dividing.

Question 8 · easy

The usual order of the four stages of gully development is:

  1. formation, stabilisation, development, healing
  2. development, formation, stabilisation, healing
  3. formation, development, healing, stabilisation
  4. healing, formation, development, stabilisation
Answer and working

C. formation, development, healing, stabilisation

A gully first forms by scour of the topsoil, then enlarges and advances its head (most active stage), then vegetation begins to establish (healing), and finally the gully stabilises with a stable gradient and cover.

Question 9 · hard

A dugout farm pond is 30 m × 30 m at the top, 3 m deep, with side slopes of 1.5:1 on all sides. By the prismoidal formula, its capacity is closest to:

  1. 1,971 m³
  2. 2,012 m³
  3. 2,700 m³
  4. 1,323 m³
Answer and working

A. 1,971 m³

Bottom side = 30 − 2 × 1.5 × 3 = 21 m; mid-depth side = 30 − 1.5 × 3 = 25.5 m. V = (d/6)(A1 + 4Am + A2) = 0.5 × (900 + 4 × 650.25 + 441) = 1,971 m³. The average-end-area formula gives 2,012 m³, an overestimate; the top area times depth ignores the sloping sides. Top area times depth gives 2,700 m³, and bottom area times depth gives 1,323 m³.

Question 10 · medium

Wind strip cropping controls erosion mainly by:

  1. channelling the wind into grassed waterways and hedged lanes, where tall vegetation absorbs its energy
  2. increasing rainfall infiltration
  3. raising the soil's organic matter
  4. reducing the unsheltered distance along the wind with alternate strips of erosion-resistant crops
Answer and working

D. reducing the unsheltered distance along the wind with alternate strips of erosion-resistant crops

Strips of resistant crops laid across the wind break the field into short lengths, so soil flow cannot build up by avalanching. In the WEQ this reduces L.

A study plan for Soil & Water Conservation Engineering in Tamil Nadu PSC

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (53% of the 51 questions): Contour and graded bunds (7, 14%); Farm ponds (6, 12%); Bench and broad-base terraces (5, 10%); Gully control (5, 10%); Drop, drop-inlet and chute spillways (4, 8%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Mechanics of water erosion (4, 8%); Soil loss estimation: USLE, RUSLE and MUSLE (4, 8%); Wind erosion control and shelterbelts (4, 8%); Agronomic and biological conservation measures (3, 6%); Earthen dams: seepage and stability (3, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Wind erosion mechanics (3, 6%); Grassed waterways (2, 4%); Sediment yield (1, 2%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Farm ponds (2 hard of 6), Bench and broad-base terraces (1 hard of 5), Contour and graded bunds (1 hard of 7).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Agronomic and biological conservation measures (3 easy of 3); Sediment yield (1 easy of 1).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — Tamil Nadu PSC Soil & Water Conservation Engineering

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.