About GATE

GATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.

Source: gate2027.iitm.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Renewable Energy Sources (Solar, Wind) in GATE

Section 3 Sources of Power: one- and two-mark numerical questions on the PV fill factor, module efficiency and area, power in the wind (½ρAV³), the Betz limit and power coefficient, and tip speed ratio. Unit discipline (kW vs kWh, rpm vs rad/s, diameter vs radius) decides marks. Solar geometry and collector efficiency appear less often but are fair game.

Solar thermal, solar PV, wind and micro-hydro for farms, from sun geometry to sizing a solar pump.

Our 44 GATE questions in this subject: 7 easy, 29 medium, 8 hard, across 13 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE and are not shown on any other exam's page.

Question 1 · medium

Estimate the day length at latitude 30° N when the declination is +23.45°.

  1. 10.1 h
  2. 13.9 h
  3. 12.0 h
  4. 7.0 h
Answer and working

B. 13.9 h

Sunset hour angle ωs = cos⁻¹(−tan 30° × tan 23.45°) = cos⁻¹(−0.2504) = 104.50°. Day length N = 2ωs/15 = 13.93 h. Using ωs/15 alone gives only half the day (7.0 h); 12 h is the equinox value; 10.1 h is the night length.

Question 2 · hard

At solar noon, latitude 30° N, declination −20°, a south-facing collector is tilted at 40°. What is the beam tilt factor Rb?

  1. 0.65
  2. 1.53
  3. 0.88
  4. 1.00
Answer and working

B. 1.53

At noon θ = |φ − β − δ| = |30 − 40 + 20| = 10° and θz = |φ − δ| = |30 + 20| = 50°. Rb = cos 10° / cos 50° = 0.9848/0.6428 = 1.53. Inverting the ratio gives 0.65; treating δ as +20° gives 0.88. 1.00 treats the collector as horizontal.

Question 3 · medium

A basin-type solar still has a daily efficiency of 35%. Daily insolation is 20 MJ/m² and the latent heat of vaporisation is 2.35 MJ/kg. What is the daily distillate output per square metre?

  1. 8.51 kg/m²
  2. 0.041 kg/m²
  3. 2.98 kg/m²
  4. 10.7 kg/m²
Answer and working

C. 2.98 kg/m²

Output = ηH/L = 0.35 × 20 / 2.35 = 2.98 kg/m² per day, in the usual 2–3 L/m² range for basin stills. Omitting efficiency gives 8.51, far above what any still achieves; 0.041 inverts H/L while keeping the efficiency factor (ηL/H = 0.35 × 2.35/20); 10.7 multiplies the correct 2.98 by 3.6, a spurious unit conversion.

Question 4 · hard

An ideal silicon cell at 300 K has light-generated current 3 A and diode saturation current 1 × 10⁻⁹ A (ideality factor 1). What is its open-circuit voltage? (k = 1.381 × 10⁻²³ J/K, q = 1.602 × 10⁻¹⁹ C)

  1. 0.245 V
  2. 564.1 V
  3. 0.564 V
  4. 0.0259 V
Answer and working

C. 0.564 V

kT/q = 1.381e-23 × 300 / 1.602e-19 = 0.02585 V. Voc = (kT/q) ln(IL/I0 + 1) = 0.02585 × ln(3 × 10⁹) = 0.02585 × 21.82 = 0.564 V. Using log₁₀ gives 0.245 V; working kT/q in mV and forgetting to convert gives 564.1 V; kT/q alone (0.0259 V) is only the thermal voltage.

Question 5 · medium

A PV module has Voc = 21.6 V, Isc = 5.0 A, Vmp = 17.2 V and Imp = 4.65 A. What is its fill factor?

  1. 0.796
  2. 0.930
  3. 0.741
  4. 1.350
Answer and working

C. 0.741

FF = VmpImp/(VocIsc) = 79.98/108.0 = 0.741. Using only the voltage ratio (0.796) or current ratio (0.930) misses half the definition; the inverse, 1.350, is greater than one, which a fill factor can never be.

Question 6 · medium

A 5 kWp PV plant produces 6,844 kWh in a year. What is its capacity utilisation factor?

  1. 15.6%
  2. 375%
  3. 0.156%
  4. 31.3%
Answer and working

A. 15.6%

CUF = E/(P × 8760) = 6844/(5 × 8760) = 0.1563 = 15.6%. Dividing by 365 instead of 8760 gives 375% (energy per day per kW, i.e. about 3.75 kWh/kWp/day, not a percentage); leaving the fraction unconverted (0.156%) mislabels it; 31.3% uses only 4380 daylight hours.

Question 7 · medium

A turbine of 10 m rotor diameter has a power coefficient of 0.40 at 8 m/s. Taking ρ = 1.225 kg/m³, what shaft power does it produce?

  1. 9.85 kW
  2. 24.63 kW
  3. 14.60 kW
  4. 39.4 kW
Answer and working

A. 9.85 kW

Power in wind = ½ρAV³ = 24.63 kW (A = π × 5²). Shaft power = 0.40 × 24.63 = 9.85 kW. Omitting Cp gives the wind power; using 16/27 gives the Betz ceiling (14.60 kW); using D as radius gives 39.4 kW.

Question 8 · medium

On a wind turbine power curve, the speed at which the turbine reaches its full nameplate output is the:

  1. Rated wind speed
  2. Cut-in wind speed
  3. Cut-out (furling) wind speed
  4. Mean annual wind speed
Answer and working

A. Rated wind speed

Cut-in is where generation starts, rated is where output reaches nameplate power and is then held constant by pitch or stall control, and cut-out is where the machine shuts down to protect itself in storms.

Question 9 · easy

A micro-hydro scheme has a flow of 0.1 m³/s through a net head of 20 m with an overall efficiency of 60%. What electrical power does it produce?

  1. 19.62 kW
  2. 1.2 kW
  3. 11.8 MW
  4. 11.77 kW
Answer and working

D. 11.77 kW

P = ρgQHη = 1000 × 9.81 × 0.1 × 20 × 0.6 = 11772 W = 11.77 kW. Omitting efficiency gives 19.62 kW; forgetting ρg gives 1.2; treating 0.1 m³/s as 100 m³/s gives megawatts.

Question 10 · medium

Two sites have the same mean wind speed. Site A has steady winds; Site B has the same mean but highly variable winds. Which site has the greater mean power density?

  1. Site A, because steady winds carry more energy
  2. Both are equal because mean speed is equal
  3. Neither can be judged without the air temperature
  4. Site B, because the mean of V³ exceeds the cube of the mean when speeds vary
Answer and working

D. Site B, because the mean of V³ exceeds the cube of the mean when speeds vary

Power density is proportional to the mean of V³, which rises with variability even at fixed mean speed (the energy pattern factor). A turbine may not capture all of it, but the resource is larger at Site B.

A study plan for Renewable Energy Sources (Solar, Wind) in GATE

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (61% of the 44 questions): Power in the wind and the Betz limit (8, 18%); Solar radiation geometry (6, 14%); Photovoltaic cell physics and the I-V curve (5, 11%); Fill factor and MPPT (4, 9%); Flat-plate collectors and their efficiency (4, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: PV system sizing: on-grid and off-grid (3, 7%); Solar pumps and agri-voltaics (3, 7%); Wind turbines and water-pumping windmills (3, 7%); Measurement of solar radiation (2, 5%); Micro-hydro (2, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Solar dryers, cookers, water heaters and stills (2, 5%); Concentrating collectors (1, 2%); Energy storage (1, 2%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Micro-hydro (1 hard of 2), Solar radiation geometry (2 hard of 6), Solar pumps and agri-voltaics (1 hard of 3).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Micro-hydro (1 easy of 2); Solar pumps and agri-voltaics (1 easy of 3).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE Renewable Energy Sources (Solar, Wind)

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.