Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) · India · Rajasthan Public Service Commission
Original practice questions written to the published syllabus · not past papersRajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) is a government recruitment exam run by Rajasthan Public Service Commission, for candidates in India. Objective paper; the paper structure was not captured.
Source: rpsc.rajasthan.gov.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Managing water at the scale of reservoirs, canals and river basins, including floods and farmer participation.
Our 28 Rajasthan PSC questions in this subject: 22 easy, 5 medium, 1 hard, across 9 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to Rajasthan PSC and are not shown on any other exam's page.
As long quoted by India's Central Water Commission, India's utilisable water resource of 1,122 BCM splits into which components?
C. 690 BCM surface water and 433 BCM replenishable groundwater
CWC gives 690 BCM utilisable surface water and 433 BCM replenishable groundwater (1,122 BCM). Swapping the two figures is the usual slip; 1,869 BCM is the average annual resource, not a surface-water component.
Which spillway type carries water down a vertical shaft and through a tunnel, and suits sites with no room for a surface channel?
C. Shaft spillway
A shaft spillway has a funnel-shaped crest leading to a vertical shaft and tunnel. The ogee crest is an overflow profile on concrete dams; side-channel and chute spillways are open channels.
At a diversion headwork, what is the function of the undersluices?
C. To keep a clear, deep approach to the canal head and flush silt deposited in the pocket
Undersluices (scouring sluices) in the pocket beside the canal head scour deposited silt and maintain a clear channel. Fish passage is the fish ladder's job; measurement and energy dissipation are handled by other works.
Where are the silt excluder and the silt ejector placed in a canal headwork, respectively?
D. Excluder in the pocket floor upstream of the head regulator; ejector a short way down the canal
The excluder draws off bed-load-rich bottom water in the pocket before it reaches the regulator; the ejector (extractor) removes silt that has entered the canal. Reversing them is the usual error.
What does a cross regulator in a parent canal do?
B. It heads up the parent canal so that offtakes can draw their share when the parent runs low
The cross regulator heads up the parent canal. Releasing surplus is an escape; dropping the bed is a fall; controlling entry to an offtake is the head regulator.
Under warabandi on a 7-day cycle, how many hours does a farmer with 6 ha in a 120 ha outlet command receive, ignoring conveyance-time adjustments?
D. 8.4 hours
Turn = 168 h × 6/120 = 8.4 h. 1.2 h uses 24 h instead of 168 h; 7.0 assumes one hour per day; 20.0 divides 120 by 6.
In north-west India and Pakistan, what is osrabandi?
C. Rotation of supply among distributaries or minors of a canal
Osrabandi rotates supply among channels; warabandi rotates turns among farmers on a watercourse; application-based allotment is shejpali.
Which of these is a non-structural flood management measure?
B. Flood plain zoning
Zoning regulates land use to reduce damage without changing the flood. Embankments, detention basins and channel works physically alter flood flows or levels.
Which part of an irrigation tank safely passes surplus flood water when the tank is full?
A. The surplus weir
The surplus weir passes floods over a fixed crest. The sluice releases water to the command; the supply channel feeds the tank; the foreshore is the area flooded when full.
Which task is normally a function of a water users' association?
D. Distributing water within its area and maintaining its channels
WUAs prepare operation plans, distribute water, maintain channels, collect fees and settle disputes within their area. Dams, national standards and state licensing belong to agencies and regulators.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.