LAISHA
Open Laisha

Rajasthan PSC Watershed Planning & Management: practice questions

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) · India · Rajasthan Public Service Commission

Original practice questions written to the published syllabus · not past papers
10worked here, free
24written to this exam in this subject
10syllabus units

About Rajasthan PSC

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) is a government recruitment exam run by Rajasthan Public Service Commission, for candidates in India. Objective paper; the paper structure was not captured.

Source: rpsc.rajasthan.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Watershed Planning & Management in Rajasthan PSC

Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.

Our 24 Rajasthan PSC questions in this subject: 14 easy, 10 medium, 0 hard, across 10 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to Rajasthan PSC and are not shown on any other exam's page.

Question 1 · easy

When a watershed divide is traced on a topographic map, the divide line should cross each contour line:

  1. parallel to it
  2. at right angles
  3. at about 45°
  4. only where the contour meets a stream
Answer and working

B. at right angles

Surface water flows perpendicular to contours, down the steepest slope, so the line separating two flow directions also crosses contours at right angles. A divide drawn along a contour is the most common hand-delineation error; the divide never crosses a stream except at the outlet.

Question 2 · easy

Watershed treatment is normally carried out in the ridge-to-valley sequence mainly because:

  1. treating upper slopes first prevents uncontrolled runoff from damaging structures built lower down
  2. valley land is always government land and cannot be treated first
  3. structures in the valley are cheaper and should be left for the end, when unspent funds are available
  4. ridge areas have the most fertile soils and give the highest returns, so they repay investment fastest
Answer and working

A. treating upper slopes first prevents uncontrolled runoff from damaging structures built lower down

Runoff and sediment from untreated upper slopes can overtop or silt up check dams and ponds in the drainage line. Treating the ridge and slopes first reduces the flow the lower structures must handle. Ownership, cost and fertility are not the reason; ridge soils are usually the shallowest and least fertile.

Question 3 · easy

In the USDA land capability classification, the classes suitable for cultivation are:

  1. I to III
  2. I to IV
  3. I to VI
  4. V to VIII
Answer and working

B. I to IV

Classes I–IV are suited to cultivation with increasing limitations; classes V–VIII are not suited to cultivation and are used for pasture, range, woodland, wildlife or recreation.

Question 4 · easy

A depth of 1 mm of water spread over 1 hectare is equal to:

  1. 10 m³
  2. 1 m³
  3. 100 m³
  4. 1,000 m³
Answer and working

A. 10 m³

1 ha = 10,000 m² and 1 mm = 0.001 m, so the volume is 10,000 × 0.001 = 10 m³ (10,000 litres). This conversion underlies most water budget and harvesting calculations.

Question 5 · medium

A village has 1,200 people and 800 animals. Planning norms of 55 litres per person per day and 30 litres per animal per day are adopted. The annual domestic and livestock water demand is about:

  1. 24,090 m³
  2. 3,285 m³
  3. 90 m³
  4. 32,850 m³
Answer and working

D. 32,850 m³

Daily demand = 1,200 × 55 + 800 × 30 = 66,000 + 24,000 = 90,000 L. Annual = 90,000 × 365 = 32,850,000 L = 32,850 m³. 24,090 m³ leaves out livestock; 90 m³ is only one day's demand. The per-capita and livestock norms themselves differ by country and programme. 3,285 m³ is a factor-of-ten slip.

Question 6 · medium

A watershed's net annual groundwater availability (recharge after natural discharge) is 1,200 ha-m and the annual groundwater draft is 960 ha-m. The stage of groundwater development is:

  1. 125%
  2. 20%
  3. 44%
  4. 80%
Answer and working

D. 80%

Stage of development = annual draft / net annual availability × 100 = 960 / 1,200 × 100 = 80%. 125% inverts the ratio; 20% is the undeveloped balance. Groundwater agencies use this stage together with long-term water-level trends to categorise assessment units. 44% divides the draft by draft plus availability (960/2,160).

Question 7 · easy

A building has a roof with a plan area of 120 m². Annual rainfall is 800 mm and the runoff coefficient of the roof is 0.8. The annual roof-top harvesting potential is:

  1. 76,800 litres
  2. 96,000 litres
  3. 76.8 litres
  4. 7,680 litres
Answer and working

A. 76,800 litres

V = A × R × C = 120 m² × 800 mm × 0.8 = 76,800 litres (1 mm on 1 m² = 1 litre), about 77 m³. 96,000 litres ignores the runoff coefficient; 76.8 litres confuses m³ with litres. 7,680 litres is a decimal slip.

Question 8 · easy

In participatory rural appraisal (PRA), a transect walk is used to:

  1. count all households in the village for a census, walking from house to house with the panchayat secretary
  2. measure stream discharge at the outlet and at each check dam site along the main drainage line of the watershed
  3. rank households by income using tax records
  4. walk across the watershed with villagers from ridge to valley, recording land use, soils and problems in each zone
Answer and working

D. walk across the watershed with villagers from ridge to valley, recording land use, soils and problems in each zone

A transect walk is a systematic walk with local people through the different zones of the landscape, discussing what they see. Household ranking in PRA is done by villagers themselves (wealth ranking), not from tax records; discharge measurement is a hydrologic survey.

Question 9 · easy

Which of the following is a monitoring (rather than evaluation) activity in a watershed project?

  1. Monthly tally of works done and money spent
  2. Assessing after five years whether household incomes rose because of the project
  3. Comparing groundwater levels in treated and control watersheds over ten years
  4. Estimating the project's internal rate of return at completion
Answer and working

A. Monthly tally of works done and money spent

Monitoring tracks inputs, activities and outputs continuously during implementation. Evaluation assesses outcomes and impacts, such as income, groundwater and returns, and whether the project caused them, at mid-term, end-term or ex-post.

Question 10 · medium

The 1994 guidelines that made the watershed the unit of development for India's DPAP, DDP and IWDP, with village watershed committees and beneficiary contributions, followed the report of a committee chaired by:

  1. M. S. Swaminathan
  2. Y. K. Alagh
  3. V. Kurien
  4. C. H. Hanumantha Rao
Answer and working

D. C. H. Hanumantha Rao

The Hanumantha Rao committee's report led to the 1994 common guidelines for watershed development, which emphasised people's participation through village-level institutions. The other names are associated with other agricultural and rural development work.

A study plan for Watershed Planning & Management in Rajasthan PSC

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (63% of the 24 questions): National watershed programmes (5, 21%); Land capability classification (4, 17%); Participatory watershed planning (3, 13%); Water budgeting (3, 13%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Rainwater harvesting: check dams, percolation tanks and farm ponds (2, 8%); Roof-top rainwater harvesting (2, 8%); Watershed delineation (2, 8%); Cost-benefit analysis of watershed projects (1, 4%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Land irrigability classification (1, 4%); Watershed characterisation and morphometry (1, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Bank the easy marks: Rainwater harvesting: check dams, percolation tanks and farm ponds (2 easy of 2); Watershed delineation (2 easy of 2).

    Do these early in revision so they are fast on the day.

  5. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — Rajasthan PSC Watershed Planning & Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.