Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) · India · Rajasthan Public Service Commission
Original practice questions written to the published syllabus · not past papersRajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) is a government recruitment exam run by Rajasthan Public Service Commission, for candidates in India. Objective paper; the paper structure was not captured.
Source: rpsc.rajasthan.gov.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.
Our 24 Rajasthan PSC questions in this subject: 14 easy, 10 medium, 0 hard, across 10 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to Rajasthan PSC and are not shown on any other exam's page.
When a watershed divide is traced on a topographic map, the divide line should cross each contour line:
B. at right angles
Surface water flows perpendicular to contours, down the steepest slope, so the line separating two flow directions also crosses contours at right angles. A divide drawn along a contour is the most common hand-delineation error; the divide never crosses a stream except at the outlet.
Watershed treatment is normally carried out in the ridge-to-valley sequence mainly because:
A. treating upper slopes first prevents uncontrolled runoff from damaging structures built lower down
Runoff and sediment from untreated upper slopes can overtop or silt up check dams and ponds in the drainage line. Treating the ridge and slopes first reduces the flow the lower structures must handle. Ownership, cost and fertility are not the reason; ridge soils are usually the shallowest and least fertile.
In the USDA land capability classification, the classes suitable for cultivation are:
B. I to IV
Classes I–IV are suited to cultivation with increasing limitations; classes V–VIII are not suited to cultivation and are used for pasture, range, woodland, wildlife or recreation.
A depth of 1 mm of water spread over 1 hectare is equal to:
A. 10 m³
1 ha = 10,000 m² and 1 mm = 0.001 m, so the volume is 10,000 × 0.001 = 10 m³ (10,000 litres). This conversion underlies most water budget and harvesting calculations.
A village has 1,200 people and 800 animals. Planning norms of 55 litres per person per day and 30 litres per animal per day are adopted. The annual domestic and livestock water demand is about:
D. 32,850 m³
Daily demand = 1,200 × 55 + 800 × 30 = 66,000 + 24,000 = 90,000 L. Annual = 90,000 × 365 = 32,850,000 L = 32,850 m³. 24,090 m³ leaves out livestock; 90 m³ is only one day's demand. The per-capita and livestock norms themselves differ by country and programme. 3,285 m³ is a factor-of-ten slip.
A watershed's net annual groundwater availability (recharge after natural discharge) is 1,200 ha-m and the annual groundwater draft is 960 ha-m. The stage of groundwater development is:
D. 80%
Stage of development = annual draft / net annual availability × 100 = 960 / 1,200 × 100 = 80%. 125% inverts the ratio; 20% is the undeveloped balance. Groundwater agencies use this stage together with long-term water-level trends to categorise assessment units. 44% divides the draft by draft plus availability (960/2,160).
A building has a roof with a plan area of 120 m². Annual rainfall is 800 mm and the runoff coefficient of the roof is 0.8. The annual roof-top harvesting potential is:
A. 76,800 litres
V = A × R × C = 120 m² × 800 mm × 0.8 = 76,800 litres (1 mm on 1 m² = 1 litre), about 77 m³. 96,000 litres ignores the runoff coefficient; 76.8 litres confuses m³ with litres. 7,680 litres is a decimal slip.
In participatory rural appraisal (PRA), a transect walk is used to:
D. walk across the watershed with villagers from ridge to valley, recording land use, soils and problems in each zone
A transect walk is a systematic walk with local people through the different zones of the landscape, discussing what they see. Household ranking in PRA is done by villagers themselves (wealth ranking), not from tax records; discharge measurement is a hydrologic survey.
Which of the following is a monitoring (rather than evaluation) activity in a watershed project?
A. Monthly tally of works done and money spent
Monitoring tracks inputs, activities and outputs continuously during implementation. Evaluation assesses outcomes and impacts, such as income, groundwater and returns, and whether the project caused them, at mid-term, end-term or ex-post.
The 1994 guidelines that made the watershed the unit of development for India's DPAP, DDP and IWDP, with village watershed committees and beneficiary contributions, followed the report of a committee chaired by:
D. C. H. Hanumantha Rao
The Hanumantha Rao committee's report led to the 1994 common guidelines for watershed development, which emphasised people's participation through village-level institutions. The other names are associated with other agricultural and rural development work.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.