GATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.

Source: gate2027.iitm.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Watershed Planning & Management in GATE

Section 4 Watershed Management: numerical-answer questions on morphometric parameters (form factor, circularity and elongation ratios, drainage density, bifurcation ratio), water budget arithmetic and harvesting volumes; short conceptual questions on land capability classes and prioritisation. Unit slips between mm, ha and m³ cost the most marks.

Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.

Our 36 GATE questions in this subject: 6 easy, 20 medium, 10 hard, across 8 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE and are not shown on any other exam's page.

Question 1 · medium

Which sequence is correct for delineating a watershed from a digital elevation model (DEM) in a GIS?

  1. Flow accumulation → fill sinks → flow direction → delineate watershed → snap pour point
  2. Flow direction → delineate watershed → fill sinks → flow accumulation → snap pour point
  3. Snap pour point → flow accumulation → flow direction → fill sinks → delineate watershed
  4. Fill sinks → flow direction → flow accumulation → snap pour point → delineate watershed
Answer and working

D. Fill sinks → flow direction → flow accumulation → snap pour point → delineate watershed

Sinks must be filled first or flow gets trapped in pits; flow direction is then computed from the filled DEM, and flow accumulation from flow direction. The pour point is snapped to a high-accumulation cell before the upstream area draining to it is delineated. Computing accumulation before direction is impossible because accumulation counts cells along flow directions.

Question 2 · medium

In the D8 flow-direction method applied to a DEM, the flow from each cell is assigned to:

  1. all lower neighbours in proportion to their slopes
  2. the neighbour with the lowest absolute elevation in the whole DEM
  3. the one of its eight neighbours with the steepest downhill slope
  4. the nearest cell already classified as stream
Answer and working

C. the one of its eight neighbours with the steepest downhill slope

D8 sends all flow from a cell to a single neighbour, the one with the steepest drop per unit distance (diagonal distances are longer by √2). Splitting flow among several lower neighbours describes multiple-flow-direction or D-infinity methods, not D8.

Question 3 · hard

A DEM cell of 30 m × 30 m has elevation 100 m. Its neighbours are: north 98, north-east 97, east 99, south-east 96, south 97, south-west 99, west 101 and north-west 98 m. Using the D8 method (diagonal distance = 30√2 m), in which direction does the cell drain?

  1. South
  2. South-east
  3. North-east
  4. West
Answer and working

A. South

D8 compares slope = drop ÷ distance. South: 3/30 = 0.1000. South-east: 4/42.43 = 0.0943. North-east: 3/42.43 = 0.0707. North: 2/30 = 0.0667. South has the steepest slope, so flow goes south. South-east has the largest drop (4 m) and is the tempting answer if the longer diagonal distance is ignored; west is uphill.

Question 4 · easy

The total length of all streams in a 45 km² watershed is 58.5 km. The drainage density is:

  1. 1.30 km/km²
  2. 0.77 km/km²
  3. 0.13 km/km²
  4. 0.38 km/km²
Answer and working

A. 1.30 km/km²

Dd = ΣL / A = 58.5 / 45 = 1.30 km/km². 0.77 is the inverse (area per unit length). 0.38 is the length of overland flow, 1/(2Dd), which is in km, not km/km². 0.13 is a decimal slip in the area (58.5/450).

Question 5 · medium

A watershed has an area of 50 km² and a perimeter of 40 km. Its circularity ratio (Miller) is:

  1. 1.250
  2. 2.546
  3. 0.098
  4. 0.393
Answer and working

D. 0.393

Rc = 4πA / P² = 4π × 50 / 40² = 628.3 / 1600 = 0.393. 1.25 is simply area over perimeter; 2.55 is the inverse (equal to Cc²); 0.098 omits the factor 4. A circle has Rc = 1; lower values mean an elongated or irregular basin.

Question 6 · medium

The highest point on the divide of a watershed is at 1240 m and the outlet at 580 m. The basin length is 16.5 km. The relief ratio (dimensionless) is:

  1. 40.0
  2. 0.040
  3. 0.075
  4. 0.035
Answer and working

B. 0.040

Basin relief H = 1240 − 580 = 660 m. Rh = H / Lb = 660 / 16,500 m = 0.040. 40.0 is H in metres divided by Lb in kilometres, a unit slip. Using the highest elevation (0.075) or the outlet elevation alone (0.035) instead of the difference is wrong.

Question 7 · medium

Two watersheds have the same area, soils and rainfall. Watershed X is nearly circular (form factor 0.70) and watershed Y is elongated (form factor 0.25). For the same storm, compared with Y, watershed X is expected to have:

  1. a lower and later peak discharge
  2. the same peak, because peak depends only on area
  3. a higher, earlier peak
  4. a lower peak but a larger total runoff volume
Answer and working

C. a higher, earlier peak

In a compact basin, runoff from all parts reaches the outlet at about the same time, so flows add up into a sharp, early peak. In an elongated basin, contributions arrive over a longer period, giving a flatter, later peak. With the same area, soils and rainfall, total runoff volume is about the same; shape changes the timing and peak.

Question 8 · hard

A farmer's field is on a gentle slope with deep, slowly permeable clay soil in a region of fairly high rainfall. Which bund type suits it better, and why?

  1. Contour bund, because it holds all runoff on the field, and slowly permeable clay needs the extra moisture
  2. Contour bund, because graded bunds are only for sandy soils in low-rainfall areas with rapid infiltration
  3. No bund, because clay soils cannot erode
  4. Graded bund, because it leads excess runoff safely to an outlet instead of ponding it on the clay
Answer and working

D. Graded bund, because it leads excess runoff safely to an outlet instead of ponding it on the clay

Contour bunds hold water behind them and suit low-rainfall areas with permeable soils, where the ponded water infiltrates. On slowly permeable clays with high rainfall, ponding causes waterlogging and bund overtopping, so graded bunds with a slight longitudinal grade lead excess water to a grassed waterway. Clay soils can erode, especially when wet.

Question 9 · easy

A watershed project has a present value of benefits of 15.6 million and a present value of costs of 12.0 million (same currency and discount rate). Its benefit-cost ratio and net present value are:

  1. BCR 0.77; NPV 3.6 million
  2. BCR 1.30; NPV 3.6 million
  3. BCR 1.30; NPV 27.6 million
  4. BCR 3.60; NPV 1.3 million
Answer and working

B. BCR 1.30; NPV 3.6 million

BCR = PV benefits / PV costs = 15.6 / 12.0 = 1.30; NPV = 15.6 − 12.0 = 3.6 million. 0.77 is the inverse ratio. BCR > 1 and NPV > 0 both show the project is acceptable at this discount rate.

Question 10 · hard

A micro-watershed project costs 400 thousand now and gives net benefits of 120 thousand at the end of each year for 5 years. At a 12% discount rate, its NPV is about:

  1. 32.6 thousand
  2. 200.0 thousand
  3. -32.6 thousand
  4. 432.6 thousand
Answer and working

A. 32.6 thousand

Annuity factor = [1 − 1.12^−5] / 0.12 = 3.6048. PV benefits = 120 × 3.6048 = 432.6. NPV = 432.6 − 400 = 32.6 thousand, positive, so acceptable at 12%. 200 is undiscounted; 432.6 is the PV of benefits without subtracting cost.

A study plan for Watershed Planning & Management in GATE

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (61% of the 36 questions): Watershed characterisation and morphometry (12, 33%); Cost-benefit analysis of watershed projects (5, 14%); Rainwater harvesting: check dams, percolation tanks and farm ponds (5, 14%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Watershed delineation (5, 14%); Land capability classification (3, 8%); Water budgeting (3, 8%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Roof-top rainwater harvesting (2, 6%); Land irrigability classification (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Water budgeting (2 hard of 3), Cost-benefit analysis of watershed projects (3 hard of 5), Roof-top rainwater harvesting (1 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Cost-benefit analysis of watershed projects (2 easy of 5); Watershed characterisation and morphometry (3 easy of 12).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE Watershed Planning & Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All