Original practice questions written to the published syllabus · not past papersGATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.
Source: gate2027.iitm.ac.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Section 4 Watershed Management: numerical-answer questions on morphometric parameters (form factor, circularity and elongation ratios, drainage density, bifurcation ratio), water budget arithmetic and harvesting volumes; short conceptual questions on land capability classes and prioritisation. Unit slips between mm, ha and m³ cost the most marks.
Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.
Our 36 GATE questions in this subject: 6 easy, 20 medium, 10 hard, across 8 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to GATE and are not shown on any other exam's page.
Which sequence is correct for delineating a watershed from a digital elevation model (DEM) in a GIS?
D. Fill sinks → flow direction → flow accumulation → snap pour point → delineate watershed
Sinks must be filled first or flow gets trapped in pits; flow direction is then computed from the filled DEM, and flow accumulation from flow direction. The pour point is snapped to a high-accumulation cell before the upstream area draining to it is delineated. Computing accumulation before direction is impossible because accumulation counts cells along flow directions.
In the D8 flow-direction method applied to a DEM, the flow from each cell is assigned to:
C. the one of its eight neighbours with the steepest downhill slope
D8 sends all flow from a cell to a single neighbour, the one with the steepest drop per unit distance (diagonal distances are longer by √2). Splitting flow among several lower neighbours describes multiple-flow-direction or D-infinity methods, not D8.
A DEM cell of 30 m × 30 m has elevation 100 m. Its neighbours are: north 98, north-east 97, east 99, south-east 96, south 97, south-west 99, west 101 and north-west 98 m. Using the D8 method (diagonal distance = 30√2 m), in which direction does the cell drain?
A. South
D8 compares slope = drop ÷ distance. South: 3/30 = 0.1000. South-east: 4/42.43 = 0.0943. North-east: 3/42.43 = 0.0707. North: 2/30 = 0.0667. South has the steepest slope, so flow goes south. South-east has the largest drop (4 m) and is the tempting answer if the longer diagonal distance is ignored; west is uphill.
The total length of all streams in a 45 km² watershed is 58.5 km. The drainage density is:
A. 1.30 km/km²
Dd = ΣL / A = 58.5 / 45 = 1.30 km/km². 0.77 is the inverse (area per unit length). 0.38 is the length of overland flow, 1/(2Dd), which is in km, not km/km². 0.13 is a decimal slip in the area (58.5/450).
A watershed has an area of 50 km² and a perimeter of 40 km. Its circularity ratio (Miller) is:
D. 0.393
Rc = 4πA / P² = 4π × 50 / 40² = 628.3 / 1600 = 0.393. 1.25 is simply area over perimeter; 2.55 is the inverse (equal to Cc²); 0.098 omits the factor 4. A circle has Rc = 1; lower values mean an elongated or irregular basin.
The highest point on the divide of a watershed is at 1240 m and the outlet at 580 m. The basin length is 16.5 km. The relief ratio (dimensionless) is:
B. 0.040
Basin relief H = 1240 − 580 = 660 m. Rh = H / Lb = 660 / 16,500 m = 0.040. 40.0 is H in metres divided by Lb in kilometres, a unit slip. Using the highest elevation (0.075) or the outlet elevation alone (0.035) instead of the difference is wrong.
Two watersheds have the same area, soils and rainfall. Watershed X is nearly circular (form factor 0.70) and watershed Y is elongated (form factor 0.25). For the same storm, compared with Y, watershed X is expected to have:
C. a higher, earlier peak
In a compact basin, runoff from all parts reaches the outlet at about the same time, so flows add up into a sharp, early peak. In an elongated basin, contributions arrive over a longer period, giving a flatter, later peak. With the same area, soils and rainfall, total runoff volume is about the same; shape changes the timing and peak.
A farmer's field is on a gentle slope with deep, slowly permeable clay soil in a region of fairly high rainfall. Which bund type suits it better, and why?
D. Graded bund, because it leads excess runoff safely to an outlet instead of ponding it on the clay
Contour bunds hold water behind them and suit low-rainfall areas with permeable soils, where the ponded water infiltrates. On slowly permeable clays with high rainfall, ponding causes waterlogging and bund overtopping, so graded bunds with a slight longitudinal grade lead excess water to a grassed waterway. Clay soils can erode, especially when wet.
A watershed project has a present value of benefits of 15.6 million and a present value of costs of 12.0 million (same currency and discount rate). Its benefit-cost ratio and net present value are:
B. BCR 1.30; NPV 3.6 million
BCR = PV benefits / PV costs = 15.6 / 12.0 = 1.30; NPV = 15.6 − 12.0 = 3.6 million. 0.77 is the inverse ratio. BCR > 1 and NPV > 0 both show the project is acceptable at this discount rate.
A micro-watershed project costs 400 thousand now and gives net benefits of 120 thousand at the end of each year for 5 years. At a 12% discount rate, its NPV is about:
A. 32.6 thousand
Annuity factor = [1 − 1.12^−5] / 0.12 = 3.6048. PV benefits = 120 × 3.6048 = 432.6. NPV = 432.6 − 400 = 32.6 thousand, positive, so acceptable at 12%. 200 is undiscounted; 432.6 is the PV of benefits without subtracting cost.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.