ICAR AIEEA-PG Watershed Planning & Management: practice questions

ICAR AIEEA-PG — Agricultural Engineering & Technology (Major Subject Group 10) · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
69written to this exam in this subject
10syllabus units

About ICAR AIEEA-PG

ICAR AIEEA-PG — Agricultural Engineering & Technology (Major Subject Group 10) is a postgraduate admission exam run by National Testing Agency for ICAR, for candidates in India. Computer-based, 120 minutes, 120 MCQs, +4 / −1, English only (2026 bulletin). One paper for the whole subject group.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Watershed Planning & Management in ICAR AIEEA-PG

Unit VII single-answer MCQs: definitions and formulas of morphometric parameters, land capability classes and subclasses, USBR irrigability classes, types of harvesting structures, and the history of Indian watershed programmes.

Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.

Our 69 ICAR AIEEA-PG questions in this subject: 33 easy, 31 medium, 5 hard, across 10 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AIEEA-PG and are not shown on any other exam's page.

Question 1 · easy

Land capability class VIII land is best used for:

  1. occasional cultivation with careful management
  2. grazing under controlled management only
  3. intensive irrigated cropping after reclamation
  4. recreation, wildlife or water supply
Answer and working

D. recreation, wildlife or water supply

Class VIII has limitations that preclude commercial plant production, including grazing and woodland production. Occasional cultivation fits class IV; controlled grazing and woodland fit classes VI and VII.

Question 2 · medium

In land capability classification, the subclass symbols e, w, s and c stand for limitations due to:

  1. erosion, excess water, soil root zone, and climate
  2. erosion, wind, salinity, and clay
  3. elevation, water table, slope, and cover
  4. erodibility, water quality, stoniness, and crop
Answer and working

A. erosion, excess water, soil root zone, and climate

The four subclasses are e (erosion hazard), w (wetness, drainage or overflow), s (soil root zone limitations such as shallowness, stones, low water capacity, salinity or sodicity) and c (climatic limitation). Salinity is included under s, and slope is expressed through erosion hazard.

Question 3 · easy

In the US Bureau of Reclamation (USBR) land classification for irrigation, land classes 1, 2 and 3 are:

  1. non-arable classes pending further study
  2. arable classes of decreasing suitability for irrigated farming
  3. classes of increasing suitability, with class 3 the best
  4. classes based only on water quality
Answer and working

B. arable classes of decreasing suitability for irrigated farming

Classes 1, 2 and 3 are arable, with class 1 the most suitable and class 3 restricted. Class 4 is limited arable or special use, class 5 non-arable pending further study and class 6 non-arable.

Question 4 · medium

Water from a new well in a watershed has a high sodium adsorption ratio (SAR). The main risk of irrigating a clay soil with it over time is:

  1. an immediate increase in soil organic matter
  2. faster drainage through the soil profile
  3. acidification of the soil to pH below 5 as the sodium displaces calcium
  4. clay dispersion, cutting infiltration
Answer and working

D. clay dispersion, cutting infiltration

High sodium relative to calcium and magnesium displaces them on clay exchange sites; sodic clay disperses, sealing the surface and reducing permeability. Water quality is one of the four groups of factors in irrigability classification. Sodic conditions tend to raise pH, not lower it.

Question 5 · hard

For a watershed over one year: rainfall 850 mm, runoff at the outlet 120 mm, deep percolation 95 mm and an increase in soil moisture storage of 15 mm. There is no inflow across the divide. Actual evapotranspiration is:

  1. 650 mm
  2. 620 mm
  3. 635 mm
  4. 730 mm
Answer and working

B. 620 mm

P = ET + Q + R + ΔS, so ET = 850 − 120 − 95 − 15 = 620 mm. Adding the storage increase (650 mm) gets its sign wrong: water that went into storage did not evaporate. 635 mm ignores storage altogether. 730 mm subtracts only the runoff (850 − 120).

Question 6 · easy

A farm pond has a catchment of 8 ha. Seasonal rainfall is 650 mm and the seasonal runoff coefficient is 0.25. The runoff available to fill the pond is:

  1. 52,000 m³
  2. 13,000 m³
  3. 1,300 m³
  4. 130,000 m³
Answer and working

B. 13,000 m³

Runoff = C × P × A = 0.25 × 0.65 m × 80,000 m² = 13,000 m³. 52,000 m³ is total rainfall on the catchment (runoff coefficient omitted). The other two are factor-of-ten slips in converting hectares to m².

Question 7 · easy

Which of the following is a good site characteristic for a check dam on a drainage line?

  1. A wide, shallow channel with eroding banks
  2. A steep bed slope so that water leaves the site quickly
  3. A site with no wells or farmers within several kilometres
  4. A narrow, well-defined channel with stable high banks and a gentle bed slope upstream
Answer and working

D. A narrow, well-defined channel with stable high banks and a gentle bed slope upstream

A narrow section keeps the structure short and cheap; stable banks prevent outflanking; a gentle bed slope makes the stored pool extend far upstream; and nearby users make use of the stored water and recharge. Steep beds give short pools and wide channels need long, costly structures.

Question 8 · medium

When computing the volume of a farm pond with sloping sides, the average end-area formula compared with the prismoidal formula generally:

  1. underestimates the volume
  2. gives exactly the same volume
  3. overestimates the volume
  4. gives a volume independent of depth
Answer and working

C. overestimates the volume

For a frustum of a pyramid the average end-area method, h(A1 + A2)/2, weights the large top area too heavily and gives a larger value than the exact prismoidal result, (h/6)(A1 + 4Am + A2). For a 30 m square top, 18 m square bottom and 3 m depth the two give 1,836 m³ and 1,764 m³.

Question 9 · medium

'Social fencing' in watershed management refers to:

  1. a physical fence built with community labour
  2. fencing of private fields by the richest farmers
  3. protection of treated or closed areas through rules agreed and enforced by the community itself
  4. a law passed by the state prohibiting grazing on treated land, enforced by the forest guards and police
Answer and working

C. protection of treated or closed areas through rules agreed and enforced by the community itself

Social fencing means the community agrees not to graze or cut in a regenerating area and enforces the rule itself, often with fines or watchers it appoints, instead of relying on physical fences or state orders that are hard to enforce.

Question 10 · easy

In India, a very large share of water conservation and harvesting works in villages, such as farm ponds, check dams and desilting of tanks, is also carried out under:

  1. the national highway development programme (NHDP)
  2. the rural employment guarantee scheme (MGNREGS)
  3. the smart cities mission
  4. the national rail development plan
Answer and working

B. the rural employment guarantee scheme (MGNREGS)

Water conservation and harvesting are among the permissible works under the Mahatma Gandhi National Rural Employment Guarantee Scheme, which combines wage employment with asset creation. The other programmes deal with roads, urban areas and railways.

A study plan for Watershed Planning & Management in ICAR AIEEA-PG

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (54% of the 69 questions): Watershed characterisation and morphometry (15, 22%); Land capability classification (9, 13%); Cost-benefit analysis of watershed projects (7, 10%); Participatory watershed planning (6, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Rainwater harvesting: check dams, percolation tanks and farm ponds (6, 9%); Roof-top rainwater harvesting (6, 9%); Water budgeting (6, 9%); Land irrigability classification (5, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: National watershed programmes (5, 7%); Watershed delineation (4, 6%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Water budgeting (2 hard of 6), Cost-benefit analysis of watershed projects (2 hard of 7), Watershed characterisation and morphometry (1 hard of 15).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Watershed delineation (3 easy of 4); National watershed programmes (3 easy of 5).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AIEEA-PG Watershed Planning & Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.