LAISHA
Open Laisha

Rajasthan PSC Watershed Hydrology: practice questions

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) · India · Rajasthan Public Service Commission

Original practice questions written to the published syllabus · not past papers
10worked here, free
37written to this exam in this subject
12syllabus units

About Rajasthan PSC

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) is a government recruitment exam run by Rajasthan Public Service Commission, for candidates in India. Objective paper; the paper structure was not captured.

Source: rpsc.rajasthan.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Watershed Hydrology in Rajasthan PSC

Rain to runoff: measuring precipitation, subtracting losses, estimating runoff and routing floods.

Our 37 Rajasthan PSC questions in this subject: 19 easy, 14 medium, 4 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to Rajasthan PSC and are not shown on any other exam's page.

Question 1 · easy

Over one year a catchment receives 1,000 mm of rain, 350 mm leaves as runoff and evapotranspiration is 550 mm. Groundwater exchange across the divide is negligible. What is the change in catchment storage?

  1. −100 mm (storage decreases)
  2. +100 mm (storage increases)
  3. +1,900 mm
  4. +450 mm
Answer and working

B. +100 mm (storage increases)

ΔS = P − R − ET = 1000 − 350 − 550 = +100 mm. A negative answer comes from reversing the sign convention; 1,900 mm adds all terms; 450 mm forgets the runoff term (1000 − 550).

Question 2 · easy

A rain gauge is to be installed near a tree 8 m tall. Following the usual siting rule, the minimum distance from the tree is about:

  1. 8 m
  2. 4 m
  3. 64 m
  4. 16 m
Answer and working

D. 16 m

Obstructions should be no closer than about twice their height: 2 × 8 = 16 m. 8 m (equal to the height) is too close and the tree would shelter the gauge. 4 m is half the height, and 64 m squares the height instead of doubling it.

Question 3 · easy

Double-mass analysis of rainfall records is used to:

  1. estimate missing daily rainfall from the neighbouring stations' records
  2. compute the mean areal rainfall
  3. check and correct the consistency of a station's record
  4. derive intensity-duration-frequency curves
Answer and working

C. check and correct the consistency of a station's record

A break in slope of the double-mass curve shows a change in gauge site, exposure or practice. Missing data are filled by the normal ratio or averaging methods, not by double-mass analysis.

Question 4 · easy

The textbook pan coefficient commonly used to convert Class A pan evaporation to lake evaporation is about:

  1. 1.0
  2. 0.7
  3. 0.3
  4. 1.3
Answer and working

B. 0.7

About 0.7 (range roughly 0.6–0.8). A pan evaporates more than a lake, so the coefficient is less than 1; 1.3 would wrongly make the lake evaporate more. 0.3 is 1 − 0.7, the fraction by which the pan over-reads, not the coefficient.

Question 5 · medium

A 1.2 km² reservoir has average Class A pan evaporation of 7.5 mm/day over a 30-day month. With a pan coefficient of 0.7, the evaporation loss is:

  1. 189,000 m³
  2. 270,000 m³
  3. 1,890 m³
  4. 385,714 m³
Answer and working

A. 189,000 m³

Lake evaporation = 0.7 × 7.5 × 30 = 157.5 mm; volume = 0.1575 × 1.2 × 10⁶ = 189,000 m³. 270,000 m³ forgets the pan coefficient; dividing by 0.7 applies it the wrong way; 1,890 m³ is a km²-to-ha slip. Dividing by 0.7 gives 270,000/0.7 = 385,714 m³.

Question 6 · medium

At 8 a.m. on day 1 the water depth in an evaporation pan is 195 mm. At 8 a.m. on day 2 it is 188 mm, and 6 mm of rain fell in between. No water was added. The pan evaporation for the day is:

  1. 7 mm
  2. 1 mm
  3. 9.1 mm
  4. 13 mm
Answer and working

D. 13 mm

E = (195 − 188) + 6 = 13 mm, because the rain raised the level. 7 mm ignores the rain; 1 mm subtracts it; 9.1 mm wrongly applies a pan coefficient to the pan reading itself.

Question 7 · hard

A grassed waterway drains 30 ha. The longest flow path is 700 m at a slope of 0.02, C = 0.45, and the local IDF relation is i = 1000 T^0.2/(D + 20)^0.8 (i in mm/h, D in min). For a 10-year return period, the design peak using Kirpich's tc is about:

  1. 1.78 m³/s
  2. 357 m³/s
  3. 5.36 m³/s
  4. 3.57 m³/s
Answer and working

D. 3.57 m³/s

tc = 0.01947 × 700^0.77 × 0.02^−0.385 = 13.6 min. i = 1000 × 10^0.2/(13.6 + 20)^0.8 = 95.2 mm/h. Q = 0.45 × 95.2 × 30/360 = 3.57 m³/s. Using a 60-minute duration instead of tc gives 1.78; entering tc in hours in the IDF formula gives 5.36 m³/s; the 3.6 constant with hectares gives 357 m³/s, 100 times too large.

Question 8 · medium

A 60 ha catchment yields 35 mm of direct runoff in a storm. The runoff volume available for a farm pond is:

  1. 2,100 m³
  2. 210,000 m³
  3. 350 m³
  4. 21,000 m³
Answer and working

D. 21,000 m³

1 mm over 1 ha = 10 m³, so 35 × 10 × 60 = 21,000 m³. 2,100 and 210,000 m³ are factor-of-ten slips in the unit conversion, and 350 m³ forgets the area.

Question 9 · easy

The reduction in the peak discharge of a flood as it passes through a reservoir or a reach is called:

  1. translation
  2. superposition
  3. recession
  4. attenuation
Answer and working

D. attenuation

Attenuation is the lowering of the peak; translation is the delay in time. Both are caused by storage.

Question 10 · medium

A district's seasonal rainfall departure from normal is −30%. In IMD's rainfall departure categories this is:

  1. normal
  2. large deficient
  3. deficient
  4. no rain
Answer and working

C. deficient

Normal is within ±19%, deficient −20 to −59% and large deficient −60 to −99%, so −30% is deficient.

A study plan for Watershed Hydrology in Rajasthan PSC

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (51% of the 37 questions): Drought classification (6, 16%); Interception and evaporation (pan) (5, 14%); Missing rainfall data and double-mass analysis (4, 11%); Runoff estimation: rational method (4, 11%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Frequency analysis, return period and IDF curves (3, 8%); Streamflow measurement (3, 8%); The hydrologic cycle (3, 8%); Flood routing: Muskingum and reservoir (Puls) methods (2, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Hydrographs and the unit hydrograph (2, 5%); Precipitation measurement and rain-gauge networks (2, 5%); Runoff estimation: SCS curve number (2, 5%); Infiltration: Horton, Philip and the phi-index (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Runoff estimation: rational method (2 hard of 4), The hydrologic cycle (1 hard of 3), Drought classification (1 hard of 6).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Precipitation measurement and rain-gauge networks (2 easy of 2); Infiltration: Horton, Philip and the phi-index (1 easy of 1).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — Rajasthan PSC Watershed Hydrology

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.