LAISHA
Open Laisha

ASRB NET Watershed Hydrology: practice questions

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering · India · Agricultural Scientists Recruitment Board (ICAR)

Original practice questions written to the published syllabus · not past papers
10worked here, free
24written to this exam in this subject
12syllabus units

About ASRB NET

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering is a specialist certification exam run by Agricultural Scientists Recruitment Board (ICAR), for candidates in India. NET: 150 MCQs, 150 marks, 2 hours, −1/3 per wrong answer, English/Hindi, PG level. Combined NET/ARS/SMS/STO recruitment runs prelims, mains and interview.

Official site: pw.live.

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.

Watershed Hydrology in ASRB NET

Hydrology and soil and water conservation at PG depth: similar to the ICAR PhD papers, with emphasis on concepts and standard formulas.

Rain to runoff: measuring precipitation, subtracting losses, estimating runoff and routing floods.

Our 24 ASRB NET questions in this subject: 1 easy, 6 medium, 17 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ASRB NET and are not shown on any other exam's page.

Question 1 · hard

In a humid, forested headwater catchment with deep permeable soils, storm runoff comes mainly from narrow saturated zones beside the stream that expand during the storm and shrink afterwards. This behaviour is best described as:

  1. Hortonian infiltration-excess runoff over the whole catchment
  2. baseflow from a deep confined aquifer
  3. saturation-excess runoff from a variable source area
  4. runoff from channel precipitation only
Answer and working

C. saturation-excess runoff from a variable source area

Where infiltration capacity is high, overland flow arises only where the soil has saturated from below, first near streams; the contributing area varies with wetness (the variable source area concept). Hortonian flow over the whole catchment needs intensity above infiltration capacity everywhere, which deep forest soils rarely allow.

Question 2 · medium

Older WMO guidance, widely quoted in textbooks, gives a minimum rain-gauge density for flat regions of tropical and temperate zones of about one station per:

  1. 100–250 km²
  2. 25 km²
  3. 600–900 km²
  4. 1,500–10,000 km²
Answer and working

C. 600–900 km²

600–900 km² per gauge applies to flat tropical, temperate and Mediterranean regions. 100–250 km² is the mountainous value, 25 km² is for small mountainous islands and 1,500–10,000 km² is for arid and polar zones.

Question 3 · hard

A 5-hour storm has hourly rainfall of 8, 18, 30, 12 and 5 mm. The direct runoff depth is 32 mm. The φ-index is:

  1. 8.20 mm/h
  2. 9.33 mm/h
  3. 9.00 mm/h
  4. 10.25 mm/h
Answer and working

B. 9.33 mm/h

Assume the 18, 30 and 12 mm hours exceed φ: 60 − 3φ = 32, so φ = 9.33 mm/h. Check: 8 and 5 are below it and 12 is above, so the assumption holds. 8.20 is total loss divided by duration, which ignores that low-intensity hours lose less than φ; 9.00 assumes four hours contribute, but then 8 < 9.0 fails the check. 10.25 mm/h divides the total loss (73 − 32 = 41 mm) by four hours.

Question 4 · medium

Philip's equation for a soil has sorptivity S = 24 mm h^−½ and K = 6 mm/h. The infiltration rate at t = 4 h is:

  1. 18 mm/h
  2. 72 mm/h
  3. 12 mm/h
  4. 6 mm/h
Answer and working

C. 12 mm/h

f = ½ S t^(−½) + K = 0.5 × 24/2 + 6 = 12 mm/h. 18 mm/h forgets the ½; 72 mm is the cumulative infiltration F = 24×2 + 6×4; 6 mm/h is only the long-time limit.

Question 5 · hard

Research on rainfall-runoff data from many watersheds has suggested that the standard initial abstraction ratio Ia/S = 0.2 is often too large. A value commonly proposed instead is about:

  1. 0.05
  2. 0.5
  3. 0.8
  4. 1.0
Answer and working

A. 0.05

Studies (notably by Hawkins and co-workers) found ratios around 0.05 fit many watersheds better; using it requires adjusted CN values. Ratios of 0.5 or more would suppress runoff from most storms. 0.8 is the coefficient of S in the runoff equation, not Ia/S, and 1.0 would set Ia equal to S.

Question 6 · hard

A 3-hour unit hydrograph has ordinates 0, 25, 80, 55, 30, 10, 0 m³/s at 3-hour intervals. A storm gives 1.5 cm of effective rainfall in the first 3 hours and 2.5 cm in the next 3 hours. The peak direct runoff and its time from the start of rain are:

  1. 320.0 m³/s at 6 h
  2. 200.0 m³/s at 9 h
  3. 282.5 m³/s at 6 h
  4. 282.5 m³/s at 9 h
Answer and working

D. 282.5 m³/s at 9 h

Direct runoff = 1.5 × UH + 2.5 × UH lagged 3 h. Ordinates: 0, 37.5, 182.5, 282.5, 182.5, 90, 25, 0 m³/s. The peak is 282.5 m³/s at 9 h (1.5×55 + 2.5×80). Multiplying both peaks and adding without the lag (320) wrongly assumes both blocks peak together.

Question 7 · hard

An S-curve built from a 4-hour unit hydrograph has ordinates 96 m³/s at 6 h and 180 m³/s at 12 h. The ordinate of the 6-hour unit hydrograph at 12 h is:

  1. 56 m³/s
  2. 84 m³/s
  3. 126 m³/s
  4. 42 m³/s
Answer and working

A. 56 m³/s

U(6, t) = (D/T)[S(t) − S(t − 6)] = (4/6)(180 − 96) = 56 m³/s. 84 omits the D/T scaling (it is the runoff from 1.5 cm); 126 scales by T/D. 42 halves the difference instead of scaling it by D/T = 4/6.

Question 8 · easy

The instantaneous unit hydrograph (IUH) is the limit of a D-hour unit hydrograph as:

  1. D tends to infinity
  2. the catchment area tends to zero
  3. the effective rainfall intensity tends to zero
  4. D tends to zero with the effective rainfall depth held at one unit
Answer and working

D. D tends to zero with the effective rainfall depth held at one unit

The IUH is the response to one unit of effective rainfall applied instantaneously; D → ∞ at a constant rate gives the S-curve instead.

Question 9 · medium

A 3-month Standardized Precipitation Index (SPI) value of −1.7 falls in the class:

  1. moderately dry
  2. severely dry
  3. extremely dry
  4. near normal
Answer and working

B. severely dry

SPI −1.5 to −1.99 is severely dry; −1.0 to −1.49 moderately dry; −2.0 or less extremely dry.

Question 10 · hard

The Standardized Precipitation Index is computed by:

  1. fitting a probability distribution, such as gamma, to precipitation totals for the chosen time scale and transforming the cumulative probability to a standard normal variate
  2. dividing the current rainfall by the long-term mean and subtracting 1
  3. running a soil water balance with temperature and available water capacity
  4. scaling NDVI between its historical minimum and maximum
Answer and working

A. fitting a probability distribution, such as gamma, to precipitation totals for the chosen time scale and transforming the cumulative probability to a standard normal variate

SPI is a probability transform, so values are comparable across climates. The percentage-of-normal method is simpler but not standardised; the water-balance approach is the Palmer index; scaled NDVI is the Vegetation Condition Index.

A study plan for Watershed Hydrology in ASRB NET

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (54% of the 24 questions): Drought classification (4, 17%); S-curve, IUH and synthetic unit hydrographs (4, 17%); Infiltration: Horton, Philip and the phi-index (3, 13%); Flood routing: Muskingum and reservoir (Puls) methods (2, 8%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Frequency analysis, return period and IDF curves (2, 8%); Runoff estimation: SCS curve number (2, 8%); Streamflow measurement (2, 8%); Hydrographs and the unit hydrograph (1, 4%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Interception and evaporation (pan) (1, 4%); Missing rainfall data and double-mass analysis (1, 4%); Precipitation measurement and rain-gauge networks (1, 4%); The hydrologic cycle (1, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Flood routing: Muskingum and reservoir (Puls) methods (2 hard of 2), Frequency analysis, return period and IDF curves (2 hard of 2), Runoff estimation: SCS curve number (2 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: S-curve, IUH and synthetic unit hydrographs (1 easy of 4).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ASRB NET Watershed Hydrology

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.