ASRB NET Water Resources Management, Floods & Canal Systems: practice questions

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering · India · Agricultural Scientists Recruitment Board (ICAR)

Original practice questions written to the published syllabus · not past papers
10worked here, free
57written to this exam in this subject
9syllabus units

About ASRB NET

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering is a specialist certification exam run by Agricultural Scientists Recruitment Board (ICAR), for candidates in India. NET: 150 MCQs, 150 marks, 2 hours, −1/3 per wrong answer, English/Hindi, PG level. Combined NET/ARS/SMS/STO recruitment runs prelims, mains and interview.

Official site: pw.live.

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.

Water Resources Management, Floods & Canal Systems in ASRB NET

PG-level concepts: reservoir yield and operation, sediment management, IWRM, basin planning, participatory management and water quality.

Managing water at the scale of reservoirs, canals and river basins, including floods and farmer participation.

Our 57 ASRB NET questions in this subject: 11 easy, 31 medium, 15 hard, across 9 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ASRB NET and are not shown on any other exam's page.

Question 1 · easy

Which allocation doctrine gives the holder of the oldest water right first call on supply during a shortage?

  1. Equitable and reasonable utilisation
  2. Riparian doctrine
  3. Prior appropriation
  4. Proportional sharing
Answer and working

C. Prior appropriation

Under prior appropriation ('first in time, first in right'), senior rights are met first in shortage, as in the western USA. Riparian doctrine ties rights to land bordering water; proportional sharing cuts everyone by the same fraction; equitable utilisation is the international-law principle for shared rivers.

Question 2 · medium

What does an environmental flow assessment for a river basin plan specify?

  1. The minimum flow that keeps hydropower turbines above their cavitation limit at the dam in the dry season
  2. The surplus flow that can be transferred to another basin after the basin's own irrigation needs are met
  3. The quantity, timing and quality of flow needed to sustain the river ecosystem and people relying on it
  4. The flood flow that the river must be able to pass within its natural banks without overtopping them
Answer and working

C. The quantity, timing and quality of flow needed to sustain the river ecosystem and people relying on it

Environmental flows describe the flow regime, not only a minimum, needed for ecosystems and the livelihoods depending on them. Bankfull capacity, turbine operation and transferable surplus are engineering quantities that a basin plan computes separately.

Question 3 · easy

On Brune's curve, the trap efficiency of a reservoir rises with which ratio?

  1. Reservoir capacity divided by mean annual inflow
  2. Dead storage divided by live storage
  3. Catchment area divided by water spread area
  4. Annual sediment mass divided by annual inflow volume
Answer and working

A. Reservoir capacity divided by mean annual inflow

Brune related trap efficiency to the capacity-inflow ratio; large storages with ratios near or above 1 trap 95% or more. Churchill's curve uses a sedimentation index instead; the other ratios are not the basis of either curve.

Question 4 · hard

In a multipurpose reservoir, what is the central operating conflict during the flood season?

  1. Flood control wants the pool kept low for a cushion, while conservation wants it high to secure refill
  2. Navigation wants constant releases, while flood control wants releases only after the monsoon ends
  3. Hydropower wants the pool low for maximum head, while irrigation wants it high for gravity supply to canals
  4. Sediment flushing needs the pool full, while water supply needs it empty before the monsoon
Answer and working

A. Flood control wants the pool kept low for a cushion, while conservation wants it high to secure refill

The flood cushion must be empty when floods come, but conservation purposes need the reservoir full by the end of the season. Hydropower wants a high pool for head, not a low one; flushing needs a drawn-down pool, not a full one.

Question 5 · medium

Why does rotational supply at full channel capacity often give lower conveyance losses than continuous flow at reduced capacity?

  1. Rotational supply is used only in lined channels, while continuous flow is limited to unlined channels
  2. Continuous flow must pass through more cross regulators, each of which leaks heavily at its gates
  3. Seepage stops completely when a channel runs full, because the bed soil seals under the higher head
  4. Full channels run fewer hours at higher velocity, so losses per unit delivered are smaller
Answer and working

D. Full channels run fewer hours at higher velocity, so losses per unit delivered are smaller

Running at capacity for shorter periods keeps velocities high (less silting) and losses are a smaller proportion of delivery. Lining is independent of the method; seepage does not stop at full supply.

Question 6 · medium

A command receives 450 mm of canal water and 150 mm of effective rainfall in a season, against a crop water demand of 500 mm. What is the relative water supply?

  1. 1.2
  2. 0.9
  3. 0.83
  4. 3.3
Answer and working

A. 1.2

RWS = (450 + 150) ÷ 500 = 1.2. 0.9 omits rainfall; 0.83 inverts the ratio; 3.3 divides demand by rainfall.

Question 7 · medium

What is the most common equity failure in operating a large gravity canal system?

  1. Tail-end farmers receive more water than the head because of gravity
  2. Canals deliver surplus water to every part of the command throughout the year
  3. All farmers receive equal water, but at the wrong time of the season
  4. Head reaches take more than their share, leaving tail-end farmers short
Answer and working

D. Head reaches take more than their share, leaving tail-end farmers short

Head-tail inequity is the typical failure: head users draw extra and tails go short. Gravity does not favour the tail, and surplus everywhere is not the usual problem.

Question 8 · hard

What is the 'levee effect' described in flood risk literature?

  1. Protection draws development behind defences, so losses are larger when a flood exceeds the design
  2. Levees always raise flood levels upstream above the design flood level for the whole river
  3. Levees cause the river to abandon its course and shift to a new channel within a few years
  4. Levees make floods arrive earlier at downstream towns than they did before construction
Answer and working

A. Protection draws development behind defences, so losses are larger when a flood exceeds the design

Defences reduce frequent flooding, which draws people and assets into the protected area; when a larger flood overtops or breaches, losses are greater. This is why non-structural measures complement defences.

Question 9 · medium

What is conjunctive use in a canal command?

  1. Planned combined use of canal water and groundwater, avoiding both waterlogging and aquifer depletion
  2. Running two parallel canals so that one can be closed for maintenance while the other carries flow
  3. Supplying canal water and treated sewage to farmers through the same channels on alternate days
  4. Charging farmers one combined bill for canal water and for the electricity they use in pumping
Answer and working

A. Planned combined use of canal water and groundwater, avoiding both waterlogging and aquifer depletion

Conjunctive use coordinates surface and groundwater: wells pump where seepage raises water tables, and canal water recharges where wells deplete. The other options describe other practices.

Question 10 · medium

Which on-farm practice reduces nitrate and phosphorus loads reaching a stream along a field edge?

  1. Ploughing up to the stream bank to increase the cropped area
  2. A vegetated buffer strip between the field and the stream
  3. Draining the field directly into the stream through tile outlets
  4. Applying all fertiliser in one dose before sowing
Answer and working

B. A vegetated buffer strip between the field and the stream

Buffer strips trap sediment and associated phosphorus and take up nutrients. Ploughing to the bank and a single large fertiliser dose increase losses; direct tile outlets bypass any treatment.

A study plan for Water Resources Management, Floods & Canal Systems in ASRB NET

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (51% of the 57 questions): Water resources of a country (11, 19%); Water quality management (10, 18%); Reservoirs (8, 14%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Flood control measures (7, 12%); Water users' associations and participatory irrigation management (7, 12%); Canal operation (4, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Flood estimation (4, 7%); Minor irrigation (4, 7%); Diversion works (2, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Reservoirs (4 hard of 8), Flood estimation (2 hard of 4), Diversion works (1 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Diversion works (1 easy of 2); Water quality management (3 easy of 10).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ASRB NET Water Resources Management, Floods & Canal Systems

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.