LAISHA
Open Laisha

NCEES PE Agricultural and Biological Engineering Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods): practice questions

NCEES PE Agricultural and Biological Engineering · USA · NCEES (ASABE is the content partner)

Original practice questions written to the published syllabus · not past papers
10worked here, free
32written to this exam in this subject
13syllabus units

About NCEES PE Agricultural and Biological Engineering

NCEES PE Agricultural and Biological Engineering is a licensing and registration exam run by NCEES (ASABE is the content partner), for candidates in USA. Computer-based, 85 questions, 9.5-hour appointment (8.5 hours of exam). Once a year (next: 28 Oct 2026). Closed book with the electronic NCEES handbook and supplied searchable ASABE standards; SI and US customary units.

Source: ncees.org.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in NCEES PE Agricultural and Biological Engineering

How much water a crop needs, when to give it, how to measure and convey it, and how to design surface irrigation.

Our 32 NCEES PE Agricultural and Biological Engineering questions in this subject: 3 easy, 20 medium, 9 hard, across 13 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to NCEES PE Agricultural and Biological Engineering and are not shown on any other exam's page.

Question 1 · medium

The permanent wilting point is conventionally set at −1500 kPa. Expressed as pressure head, this is closest to:

  1. −1500 m of water
  2. −1.53 m of water
  3. −15.3 m of water
  4. −153 m of water
Answer and working

D. −153 m of water

1 kPa ≈ 0.102 m of water, so −1500 kPa ≈ −153 m. −15.3 m is a factor-of-ten slip (it is −150 kPa); −1500 m treats kPa as metres. −1.53 m is a factor-of-100 slip.

Question 2 · medium

In the FAO-56 Penman-Monteith equation, what does the term γ (900 / (T + 273)) u₂ (es − ea) represent?

  1. The soil heat flux
  2. The canopy resistance of the crop
  3. The net radiation (Rn − G) contribution to ET₀
  4. The aerodynamic (vapour transport) contribution to ET₀
Answer and working

D. The aerodynamic (vapour transport) contribution to ET₀

The numerator has an energy term, 0.408 Δ (Rn − G), and an aerodynamic term driven by wind and vapour pressure deficit. Radiation and soil heat flux are in the first term; canopy resistance enters through the constant 0.34 in the denominator.

Question 3 · hard

The crop water stress index (CWSI) is based on:

  1. Leaf area index relative to its seasonal maximum
  2. Canopy-minus-air temperature difference, scaled between non-stressed and non-transpiring baselines at the same vapour pressure deficit
  3. Pan evaporation divided by rainfall
  4. Soil matric potential at 30 cm divided by the wilting-point potential, averaged over tensiometers placed at several depths in the root zone
Answer and working

B. Canopy-minus-air temperature difference, scaled between non-stressed and non-transpiring baselines at the same vapour pressure deficit

A transpiring canopy is cooled by evaporation; as stomata close its temperature rises toward that of a non-transpiring canopy. CWSI = 0 for a well-watered crop and 1 for no transpiration at the given VPD. The other options are not stress indices of this type.

Question 4 · medium

All else equal, which channel surface gives the lowest Manning roughness coefficient?

  1. Clean, straight earth channel
  2. Rough stone rubble masonry
  3. Smooth trowel-finished concrete
  4. Earth channel with dense weeds
Answer and working

C. Smooth trowel-finished concrete

Smooth concrete has n of roughly 0.011–0.015, clean earth about 0.02 or more, rubble masonry higher still, and weedy channels much higher. Values vary with condition; use a table such as Chow's.

Question 5 · medium

Along an undulating buried irrigation pipeline, where should air release valves and drain valves be placed?

  1. Both only at the downstream end
  2. Air release at low points; drain valves at high points
  3. Both only at the pump
  4. Air release at high points; drain valves at low points
Answer and working

D. Air release at high points; drain valves at low points

Air collects at summits and can block flow or cause surges, so air valves go at high points (and vacuum relief to prevent collapse on draining). Water collects at low points, where drains allow emptying for maintenance and freezing protection.

Question 6 · hard

Water flowing at 1.5 m/s in a plastic pipeline (pressure wave speed 400 m/s) is stopped instantly by a valve. What is the theoretical pressure rise by the Joukowsky equation?

  1. 300 kPa (about 31 m of water)
  2. 600 kPa (about 61 m of water)
  3. 60 kPa (about 6 m of water)
  4. 6,000 kPa (about 612 m of water)
Answer and working

B. 600 kPa (about 61 m of water)

ΔP = ρ c ΔV = 1,000 × 400 × 1.5 = 600,000 Pa = 600 kPa ≈ 61 m. 60 and 6,000 kPa are factor-of-ten slips; 300 kPa halves the result, which applies to neither instant nor slow closure.

Question 7 · medium

In a graded border with free outflow at the lower end, why is inflow usually cut off before the advancing front reaches the end?

  1. To make the upper end wetter than the lower end
  2. Because infiltration stops when inflow stops
  3. Because the lower end needs less water than the upper end, having a shallower root zone and a much lower intake rate
  4. Water already on the surface continues to advance and infiltrate, completing the irrigation while limiting runoff
Answer and working

D. Water already on the surface continues to advance and infiltrate, completing the irrigation while limiting runoff

After cut-off, the surface storage recedes down the strip and supplies the lower end. Cutting off too late wastes water as runoff; too early under-irrigates the tail. Infiltration continues wherever water stands.

Question 8 · hard

On a sandy loam border, the advance is so slow that the upper end is over-irrigated while the tail is dry. Which change most directly improves uniformity, subject to the erosion limit?

  1. Increase the unit inflow rate (or shorten the border) so advance is faster relative to the required opportunity time
  2. Lengthen the border (to spread water further)
  3. Decrease the unit inflow rate so that each metre of the border has longer to soak before the front moves on
  4. Add a cross slope to the border so that water spreads sideways faster and reaches the dry tail end in much less time overall
Answer and working

A. Increase the unit inflow rate (or shorten the border) so advance is faster relative to the required opportunity time

Uniformity depends on the difference in opportunity time between head and tail. A larger stream per unit width or a shorter run speeds advance. Reducing flow or lengthening the border worsens it, and cross slope makes water run to one side.

Question 9 · medium

In US customary units the empirical maximum non-erosive furrow stream is about 10/S gallons per minute, with S in percent. For a furrow on a 0.5 % slope this is:

  1. 0.05 gpm
  2. 5 gpm
  3. 20 gpm
  4. 2,000 gpm
Answer and working

C. 20 gpm

10 / 0.5 = 20 gpm. 5 gpm multiplies; 2,000 gpm uses S as a fraction (0.005); 0.05 gpm inverts the relation.

Question 10 · hard

Relative water supply (RWS), used to evaluate canal command performance, is defined as:

  1. Total water supply (irrigation plus rainfall) divided by crop demand (ET plus seepage and percolation where relevant)
  2. Canal discharge at the head divided by canal discharge at the tail (head-tail ratio)
  3. Crop yield divided by water supplied
  4. Irrigated area divided by culturable command area
Answer and working

A. Total water supply (irrigation plus rainfall) divided by crop demand (ET plus seepage and percolation where relevant)

RWS = total supply / total demand, as proposed by Levine and used by IWMI; values well above 1 suggest oversupply and near or below 1 suggest scarcity. Head/tail discharge ratio is an equity measure, irrigated area/CCA is intensity, and yield per water is productivity.

A study plan for Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in NCEES PE Agricultural and Biological Engineering

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (59% of the 32 questions): Underground pipeline systems (5, 16%); Furrow irrigation (4, 13%); Irrigation efficiencies and distribution uniformity (4, 13%); Border irrigation (3, 9%); Irrigation scheduling (3, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Water measurement: weirs, Parshall flume and orifices (3, 9%); Basin irrigation (2, 6%); Evapotranspiration and FAO-56 Penman-Monteith (2, 6%); Soil-water-plant relations: field capacity, wilting point and MAD (2, 6%); Command area development (1, 3%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Crop coefficients and crop water requirement (1, 3%); Design of irrigation channels (1, 3%); Effective rainfall (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Command area development (1 hard of 1), Basin irrigation (1 hard of 2), Underground pipeline systems (2 hard of 5).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Soil-water-plant relations: field capacity, wilting point and MAD (1 easy of 2); Furrow irrigation (1 easy of 4).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — NCEES PE Agricultural and Biological Engineering Irrigation Engineering (Soil-Water-Plant,

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.