LAISHA
Open Laisha

ASRB NET Surveying & Levelling: practice questions

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering · India · Agricultural Scientists Recruitment Board (ICAR)

Original practice questions written to the published syllabus · not past papers
10worked here, free
30written to this exam in this subject
12syllabus units

About ASRB NET

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering is a specialist certification exam run by Agricultural Scientists Recruitment Board (ICAR), for candidates in India. NET: 150 MCQs, 150 marks, 2 hours, −1/3 per wrong answer, English/Hindi, PG level. Combined NET/ARS/SMS/STO recruitment runs prelims, mains and interview.

Official site: pw.live.

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.

Surveying & Levelling in ASRB NET

Measuring land, levels and volumes, from chain survey to total station and GNSS, and designing land grading.

Our 30 ASRB NET questions in this subject: 1 easy, 8 medium, 21 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ASRB NET and are not shown on any other exam's page.

Question 1 · hard

When the bubble of a level was moved through 4 divisions, the staff reading at 80 m changed by 0.012 m. What is the sensitivity of the bubble tube per division?

  1. 7.7 seconds
  2. 123.8 seconds
  3. 30.9 seconds
  4. 7.7 minutes
Answer and working

A. 7.7 seconds

α = 206,265 × s/(nD) = 206,265 × 0.012/(4 × 80) = 7.7″ per division. Forgetting to divide by the number of divisions gives 30.9″; multiplying by n gives 123.8″; 7.7 minutes has the right number with the wrong unit.

Question 2 · hard

Reciprocal levelling between A and B gave: level near A, staff on A 1.485 m and on B 2.310 m; level near B, staff on A 0.960 m and on B 1.805 m. What is the combined error (collimation, curvature and refraction) in the long sight?

  1. 20 mm
  2. 835 mm
  3. 0 mm
  4. 10 mm
Answer and working

D. 10 mm

e = [(a2 − b2) − (a1 − b1)]/2 = [(−0.845) − (−0.825)]/2 = -0.010 m, i.e. 10 mm in magnitude. Forgetting to halve gives 20 mm; the 835 mm option is the true level difference, not the error. 0 mm assumes the reciprocal readings show no error at all.

Question 3 · hard

A level set at A reads 1.250 m on a staff at a point B 2.4 km away. Correcting for curvature and refraction (0.0673d² m, d in km), what is the corrected staff reading at B?

  1. 0.798 m
  2. 0.862 m
  3. 1.088 m
  4. 1.638 m
Answer and working

B. 0.862 m

Correction = −0.0673 × 2.4² = −0.3876 m, so corrected reading = 1.250 − 0.3876 = 0.862 m. The observed reading is too large because the level surface curves away below the horizontal line of sight; adding the correction is the sign slip. 0.798 m applies curvature alone (0.0785d²); 1.088 m forgets to square d; 1.638 m adds the correction.

Question 4 · hard

Reservoir areas enclosed by contours at 100, 102, 104, 106 and 108 m are 1200, 2600, 4100, 5900 and 8000 m². What is the storage between 100 m and 108 m by the prismoidal formula?

  1. 68533 m³
  2. 28400 m³
  3. 34400 m³
  4. 34267 m³
Answer and working

D. 34267 m³

Prismoidal: V = (d/3)[(A1 + A5) + 4(A2 + A4) + 2A3] = (2/3)[9200 + 4 × 8500 + 2 × 4100] = 34267 m³. The trapezoidal formula gives 34400 m³; swapping the 4 and 2 weights is a common slip; using d = 4 m double-counts. Using d = 4 m gives 68533 m³; swapping the weights gives 28400 m³.

Question 5 · hard

A tacheometer (K = 100, C = 0) is set up so that the RL of its trunnion axis is 350.250 m. On a vertical staff at an angle of elevation of 6°, the stadia readings are 1.280 and 2.530 m and the central-hair reading is 1.905 m. What is the RL of the staff station?

  1. 365.149 m
  2. 335.351 m
  3. 361.411 m
  4. 361.339 m
Answer and working

D. 361.339 m

s = 2.530 − 1.280 = 1.250 m; V = Ks sin2θ/2 = 100 × 1.250 × sin 12°/2 = 12.994 m. RL = HI + V − h = 350.250 + 12.994 − 1.905 = 361.339 m. Using Ks sin θ instead of Ks sin 2θ/2 gives 361.411 m; subtracting V treats the sight as a depression. Subtracting V gives 335.351 m; adding the central-hair reading instead of subtracting it gives 365.149 m.

Question 6 · hard

Six offsets of 2.0, 3.5, 4.2, 3.9, 3.0 and 2.4 m are taken at 10 m intervals. Using Simpson's rule for the first five ordinates and the trapezoidal rule for the last strip, what is the total area?

  1. 170.33 m²
  2. 161.33 m²
  3. 143.33 m²
  4. 168.00 m²
Answer and working

A. 170.33 m²

Simpson on O1–O5: (10/3)[2.0 + 3.0 + 4(3.5 + 3.9) + 2(4.2)] = 143.33 m². Last strip: 10(3.0 + 2.4)/2 = 27.00 m². Total = 170.33 m². Forcing Simpson onto six ordinates gives 161.33 m², which is invalid; trapezoidal throughout gives 168.00 m².

Question 7 · hard

For level sections with side slope s = 1.5 (H:V), centre depths 1.0, 1.6 and 2.2 m, and a 30 m interval between sections, what is the total prismoidal correction to be subtracted from the trapezoidal volume?

  1. 2.70 m³
  2. 5.40 m³
  3. 10.80 m³
  4. 21.60 m³
Answer and working

B. 5.40 m³

Cp = (d/6)s(h1 − h2)² per interval = (30/6)(1.5)(0.6)² = 2.70 m³, twice = 5.40 m³. This equals the trapezoidal minus prismoidal volume (630.6 − 625.2). Using the end depths (1.0 and 2.2 m) with one 30 m interval gives 10.80 m³, or with the full 60 m length 21.60 m³; both are wrong because the correction applies to each interval with its own depths. Using d/12 halves the answer.

Question 8 · medium

In a land-grading design, a 20 m × 20 m grid square has corner cuts of 0.24 and 0.10 m and corner fills of 0.06 and 0.16 m. What is the cut volume by the four-point method?

  1. 34.00 m³
  2. 20.64 m³
  3. 8.64 m³
  4. 12.00 m³
Answer and working

B. 20.64 m³

Vc = L²(Σc)²/[4(Σc + Σf)] = 400 × 0.34²/[4 × (0.34 + 0.22)] = 20.64 m³. Using L²Σc/4 (34.00 m³) treats the square as all cut; 8.64 m³ is the fill volume. 12.00 m³ takes the net cut L²(Σc − Σf)/4.

Question 9 · hard

Which is a well-documented agronomic drawback of deep cuts in land grading, and how is it usually managed?

  1. Cut areas expose less fertile subsoil and can yield less for some seasons; minimise cut depth and apply organic matter or fertiliser to cut areas
  2. Cut areas always yield more because of better drainage; no management is needed
  3. Deep cuts usually raise the water table everywhere
  4. Fill areas cannot be cropped for five years by law
Answer and working

A. Cut areas expose less fertile subsoil and can yield less for some seasons; minimise cut depth and apply organic matter or fertiliser to cut areas

Removing topsoil exposes subsoil lower in organic matter and nutrients, and crops on cut patches often lag until fertility is rebuilt. Designs minimise earth moved, and cut areas receive manure or fertiliser. The other options are not general truths.

Question 10 · medium

Which statement about contour lines is FALSE?

  1. Contours cross ridge and valley lines at right angles
  2. Contours of different elevations can merge into a single line on a gentle slope
  3. Evenly spaced, straight and parallel contour lines usually indicate a uniformly sloping plane surface
  4. A closed contour with higher values inside indicates a hill
Answer and working

B. Contours of different elevations can merge into a single line on a gentle slope

Contours of different elevations merge only at a vertical cliff and cross only at an overhang; on a gentle slope they are widely spaced, never merged. The other three statements are standard characteristics.

A study plan for Surveying & Levelling in ASRB NET

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (53% of the 30 questions): Land grading and levelling design (7, 23%); GPS/GNSS surveying (3, 10%); Levelling: rise-and-fall and height-of-instrument methods (3, 10%); Reciprocal levelling (3, 10%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Theodolite traversing and closing error (3, 10%); Chain and tape surveying, including tape corrections (2, 7%); Contouring (2, 7%); Earthwork volume computation (2, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Total station (2, 7%); Compass traversing and bearings (1, 3%); Computation of area: trapezoidal and Simpson's rules (1, 3%); Plane table surveying (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: GPS/GNSS surveying (3 hard of 3), Levelling: rise-and-fall and height-of-instrument methods (3 hard of 3), Earthwork volume computation (2 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Land grading and levelling design (1 easy of 7).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ASRB NET Surveying & Levelling

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.